
Front Section
60
9. Remove the 1st/2nd shift yoke roll pin.
Note:
Use the 4 mm diameter roll-pin punch
E021002.
10. Hold the 1st/2nd shift yoke in its place on
synchronizer groove and pull the yoke bar
upwards. When the bar lower end rises over the
housing surface (see detail), remove the bar and
shift yoke assembly.
171
11. Simultaneously, remove from the housing the
remaining assemblies of mainshaft, countershaft,
3rd/4th bar and shift yoke and input shaft, while
grasping them all together and pulling them
upwards.
173
EA037a
EA036b
EA037B
12. Take the assemblies apart.
Содержание FSO-2105
Страница 1: ......
Страница 5: ......
Страница 37: ...Installation Reference 32 FSO2105_Flex2 4L_SOHC4x2_2 FSO 2105 Model Application Flex 2 4L SOHC 4x2 PAGE 2 2 ...
Страница 39: ...Installation Reference 34 FSO2105_Flex2 4L_SOHC4x4_2 FSO 2105 Model Application Flex 2 4L SOHC 4x4 PAGE 2 2 ...
Страница 41: ...Installation Reference 36 FSO2505_Diesel4x2_2 5_2 8_2 FSO 2505 Model Application Diesel 4x2 2 5 2 8 PAGE 2 2 ...
Страница 43: ...Installation Reference 38 FSO2505_Diesel4x4_2 5_2 8_2 FSO 2505 Model Application Diesel 4x4 2 5 2 8 PAGE 2 2 ...
Страница 45: ...Installation Reference 40 FSO2505_HFV6_4x2_2 FSO 2505 Model Application HFV6 4x2 PAGE 2 2 ...
Страница 47: ...Installation Reference 42 FSO2505_HFV6_4x4_2 FSO 2505 Model Application HFV6 4x4 PAGE 2 2 ...
Страница 96: ......