BATTERY CABINET INSTALLATION
Eaton FERRUPS Rack Mount UPS (850 VA–7 kVA) Installation Guide
S
164201425 Rev 1
www.eaton.com/powerquality
36
5.
Attach the inner rails to the battery cabinet (see Figure 15). Be sure
the tab on the inner rail points to the front of the battery cabinet.
Secure the rail using three #8-32
3/8
I
Phillips pan-head screws
on each side of the cabinet.
Inner Rail
(Tab should point toward
front of the cabinet)
#8-32
3/8
I
Phillips Pan-Head
Screws
Figure 15. Attaching the Inner Rail to the Battery Cabinet
6.
Secure the supplied long and short mounting brackets to the outer
rail using at least two flat-head screws and nuts for each bracket
(see Figure 16). Leave all screws finger-tight until the rails are sized
for the rack.
Tabs
(Back of Unit)
Long Rear
Mounting Bracket
Short Front
Mounting Bracket
Long Rear
Mounting Bracket
Short Front
Mounting Bracket
Figure 16. Securing the Brackets to the Outer Rails
Содержание FERRUPS
Страница 1: ...Powerware Series Eaton FERRUPS Rack Mount UPS Installation Guide...
Страница 83: ......
Страница 84: ...1642014251 164201425 1 80 z z...