INSTALLATION SPECIFICATION
Eaton Industries Pty Ltd
August 2010
10 Kent Road, Mascot, NSW 2020, Australia
Page
5
of
13
DOCUMENT# 510091
4. Fit unit to mounting surface
Follow the instructions – either 4.1 or 4.2 depending upon enclosed or gear-tray models.
Please ensure you remove all internal shipping and packaging materials!
4.1 Enclosure models
F
Note that mounting brackets may be used in 2 positions. At least one pair of brackets must be fitted
in the vertical position to prevent skewing, preferably the upper pair. Determine the bracket
positions before marking the mounting surface.
F
Mark the surface where drilling is to take place.
F
Install mounting anchors appropriate for the mounting surface. Refer to unit weight in the technical
specifications (supplied with unit). For safety, one anchor should be capable of supporting this
weight alone.
F
Attach the mounting brackets using the short M8 fasteners supplied.
F
Using a suitable lifting device or a team of persons, lift the unit into position and secure to the
mounting surface. Assure that all mountings are made secure and the unit is solid.
F
At this point, fit cable mounting plates or brackets as required for cable installation.
4.2 Gear-tray models
F
Determine the mounting position. Unit shall be located such that it has 150mm clearance on the
sides, top and bottom, and that adequate clearance exists at the front.
F
Mark the surface where drilling is to take place.
F
Attach the unit to the mounting surface using 4x M8 or 5/16” fasteners.
F
Assure that all mountings are made secure and the unit is solid.
F
At this point, fit cable mounting plates or brackets as required for cable installation.
Unit is now mounted, ready for cable installation.
Completed by:
Date: