Eaton DualGuard-S ESF30 KV Скачать руководство пользователя страница 8

8

Mounting and Operating Instructions DualGuard-S ESF30 KV

   40071860406 (A)   March 2022   www.eaton.com

5 Transport

5 Transport

5.1 The most important aspects of transport 

in brief

•   Delivery of the fire protection system on a transport pallet

•   The systems must be inspected immediately upon delivery 

and any visible defects must be noted immediately on the 

consignment note. 

•   Defects must be reported in writing (no later than 5 working 

days after delivery).

•   The transfer of risk is upon delivery. Defects which have 

arisen due to onward transport of the systems, are exclu-

ded from subsequent fulfilment.

•    Transport of the fire protection system to the place of use 

with a suitable forklift truck on a transport pallet, protective 

corners and strapping

•   Improper transport (hard knocks, transport without air  

suspension, repeated reloading, one-sided loading when 

loading on one side during installation, etc.) can have an 

effect on the fire protection function (damage to the fire 

protection panels or their connections).

•   If the system has to be moved, this must be done only be 

carried out evenly and over the entire surface.

•   The system must be closed off.

Содержание DualGuard-S ESF30 KV

Страница 1: ...ire Resistant Cabinet Type DualGuard S ESF30 KV Mounting and Operating Instructions compact Fire resistant cabinet type DualGuard S ESF30 KV Target group qualified electricians according to DIN VDE 01...

Страница 2: ...el 5 2 6 Occupational safety 5 3 Technical data 5 4 Layout 6 4 1 DualGuard S ESF30 SOU5 and SOU4 6 4 1 1 Components DualGuard S ESF30 SOU5 and SOU4 6 4 1 2 Drawings DualGuard S ESF30 SOU5 and SOU4 6 4...

Страница 3: ...e herewith Improper installation may impair the protective function Screw connections to the building may only be made with approved suitable screws dowels The suitability of the screws dowels must be...

Страница 4: ...he right to make technical changes that serve to improve the enclosures or that are caused by legal changes even without separate notification All information and notes in these assembly and installat...

Страница 5: ...ructions exactly Any other use is considered improper CEAG Notlichtsysteme is not liable for any damage or con sequential damage resulting from this 2 2 Contents of the assembly and installation instr...

Страница 6: ...0 SOU3 4 1 2 Drawings DualGuard S ESF30 SOU5 and SOU4 4 2 2 Drawings DualGuard S ESF30 SOU3 1228 478 295 A A 200 950 139 139 139 139 A A 200 950 139 139 139 139 928 A A A A 1 5 295 478 200 139 139 139...

Страница 7: ...A A 200 350 139 139 139 A A 1 5 139 628 478 295 A A 139 A A 778 A A A A 1 5 295 478 200 139 139 139 500 139 4 3 DualGuard S ESF30 SOU2 4 3 1 Components DualGuard S ESF30 SOU2 4 3 2 Drawings DualGuard...

Страница 8: ...sk is upon delivery Defects which have arisen due to onward transport of the systems are exclu ded from subsequent fulfilment Transport of the fire protection system to the place of use with a suitabl...

Страница 9: ...from neighbouring installations such as gas or water is required In In the vicinity of doors a distance corresponding to the door must be maintained 1 Check the accessories for completeness 6 2 Inser...

Страница 10: ...10 Mounting and Operating Instructions DualGuard S ESF30 KV 40071860406 A March 2022 www eaton com Notes Notes...

Страница 11: ...11 Mounting and Operating Instructions DualGuard S ESF30 KV 40071860406 A March 2022 www eaton com Notes Notes...

Страница 12: ...iority always to find the right solution for every application Our stakeholders therefore expect more than just innovative products Companies turn to Eaton because they know that individual support an...

Отзывы: