Effective 6/01

I.B. ATS-RM05

Page 8

Carefully remove all packing material from the transfer
switch at the mounting location. Do not discard the Top
Cardboard Pad. It is used as a template for locating the
mounting holes. Even though an equipment inspection
was made when the equipment was received, make
another careful inspection of the enclosure and the
enclosed transfer switch as packing material is removed
and the enclosure readied for mounting. Be especially
alert for distorted metal, loose wires or damaged 
components.

4.3  MOUNTING PROCEDURE

EXTREME CARE SHOULD BE TAKEN TO PROTECT
THE TRANSFER SWITCH FROM DRILL CHIPS, FIL-
INGS AND OTHER CONTAMINANTS WHEN MAKING
THE CABLE ENTRY HOLES AND MOUNTING THE
ENCLOSURE TO PREVENT COMPONENT DAMAGE
OR A FUTURE MALFUNCTION .

The installation must comply fully with all applicable
codes, standards and regulations.

With the enclosed transfer switch equipment unpacked
and ready for mounting, proceed with these steps:

NOTICE

Step 1: Remove the 4 cover screws and place the 

cover in a safe place (Figure 4-3).

Step 2: Before removing the 4 screws that hold the top 

Dead Front cover in place, disconnect the 5 
white plugs on the logic board.  Care should be
taken when it is placed aside.  Remove the 4 
screws from the bottom Dead Front and place 
it in a safe place (Figure 4-4).

Step 3: Depending upon customer preference and 

Transfer Switch location, the knockouts may 
be used or additional holes may be drilled for 
cable entry and control wiring.

For control wiring (Generator start wiring), these
wires must be isolated from both power source
cables.

Step 4: Mount the switch to a rigid structure as close to 

the electrical loads as possible.  Use the card
board template provided to mark the mounting 
pattern, and start the mounting hardware sev-
eral turns into the mounting structure.  Lift the 
switch over the embossed teardrop mounting 
holes and secure the mounting screws.

Step 5: Connect cables as follows (Figure 4-5):

• NORMAL (utility) power cables to 

terminals N1, N2.

• EMERGENCY (generator) power cables 

to E1, E2.

• Customer load cables to T1, T2.
• NEUTRAL cable to Neutral terminal.
• GROUND wire to green 1/4-20 bolt.

Step 6: Generator start terminals are red and numbered

51, 52.  They are located in the lower right hand
corner of the power panel, and used when the 
generator has an automatic start feature.

Step 7: Tighten all cables and wiring to the specifictions

NOTICE

Figure 4-3 Cover Removal  

4 Screws

!

CAUTION

Содержание Cutler-Hammer RTHMFDA20100WSU

Страница 1: ...Effective 6 01 Supersedes ATS RMO4 dated June 2000 I B ATS RM05 Cutler Hammer Instructions for Cutler Hammer Residential Automatic Transfer Switch...

Страница 2: ......

Страница 3: ...S THAT CAN CAUSE DEATH OR SEVERE PERSONAL INJURY FOLLOW PROPER INSTALLATION OPERATION AND MAINTENANCE PROCEDURES TO AVOID THESE VOLTAGES TRANSFER SWITCH EQUIPMENT COVERED BY THIS INSTRUCTION BOOK IS D...

Страница 4: ...RECEIVING HANDLING AND STORAGE 2 1 Receiving 4 2 2 Handling 4 2 3 Storage 4 SECTION 3 EQUIPMENT DESCRIPTION 3 1 Introduction 5 3 2 Options 5 3 3 Standards 5 SECTION 4 INSTALLATION AND WIRING 4 1 Gener...

Страница 5: ...RM05 Page v Page SECTION 6 ADJUSTMENTS 6 1 Plant Exerciser PE Timer 16 6 1 1 Timer Programming 16 6 1 2 Provisions for Extended PE Memory 16 SECTION 7 MAINTENANCE 7 1 Introduction 17 7 2 Procedures 17...

Страница 6: ...8 4 4 Deadfront Removal 9 4 5 Cable Connections 9 4 6 Typical installation of a residential or light duty automatic transfer switch 11 4 7 Typical installation of a residential or light duty automatic...

Страница 7: ...must be strictly observed in the installation operation and maintenance of this device THE WARNINGS AND CAUTIONS INCLUDED AS PART OF THE PROCEDURAL STEPS IN THIS DOCU MENT ARE FOR PERSONNEL SAFETY AND...

Страница 8: ...gence necessary for the switch and related circuit operation 1 2 1 DESIGN CONFIGURATION The Cutler Hammer transfer switch is a rugged com pact design that utilizes molded case switches to trans fer es...

Страница 9: ...including the appropriate option which includes specially designed cleats transfer switches have a seismic capability which exceeds the worst case Zone 4 required levels per both the Uniform Building...

Страница 10: ...ating the mounting holes covers the entire opening Do not discard the packing material until the equipment is ready for installa tion Once the top packaging is removed from the shipment the enclosure...

Страница 11: ...s avail able If the emergency power source fails during timing the time delay is overridden and an immediate transfer to the normal power source will occur The TDEN timer is set for 7 minutes 3 3 STAN...

Страница 12: ...and re examination UL1087 employ a label service listing program which requires an extensive follow up testing program for list ed devices Standard UL1008 for automatic transfer switches lists devices...

Страница 13: ...sur face capable of supporting the weight of the enclosed transfer switch equipment Figure 4 1 30 100A or Figure 4 2 150 200A Avoid locations that are moist hot or dusty however there are enclosure de...

Страница 14: ...cover in place disconnect the 5 white plugs on the logic board Care should be taken when it is placed aside Remove the 4 screws from the bottom Dead Front and place it in a safe place Figure 4 4 Step...

Страница 15: ...on to the unit to ensure that conductors or cable insulation has not been damaged while being pulled into position Power cables are to be connected to solderless screw type lugs located on the transfe...

Страница 16: ...ion another typical installation for household loads can be considered Figure 4 7 Refer to Figure 4 9 for a household loads connection diagram 4 7 ENGINE START CONNECTION The engine control contact co...

Страница 17: ...n the emergency distribution 3 and the utility panel 4 Figure 4 7 Typical installation of a residential or light duty automatic transfer switch The switch 1 and generator 2 are connected to the power...

Страница 18: ...m of Typical Installation Critical Loads Only Figure 4 9 Diagram of Typical Installation All Household Loads Transfer Switch Circuit Breaker Watt Hour Meter Circuit Breaker Main Breaker Panel Emergenc...

Страница 19: ...With a lit tle bit of force push the screwdriver in on a slight angle toward the center of the clamp Be sure to slide it in until it clicks You will then see the clamp open in the wire hole Step 3 Onc...

Страница 20: ...vertop the metal rods of the terminal block Match the rounded edge of the plug with the rounded edge of the terminal block and gently push the pieces together The piece should snap when correctly in p...

Страница 21: ...GENCY to NORMAL position and the generator will shut down SECTION 5 FUNCTIONAL TESTING YOU ARE READY TO ENERGIZE THE EQUIPMENT VOLTAGES WITHIN THE ENCLOSURE ARE CAPA BLE OF CAUSING SEVERE PERSONAL INJ...

Страница 22: ...ete the Transfer Switch will transfer back to Normal The plant exerciser will now have to be reprogrammed in order to exercise the generator 6 1 2 PROVISIONS FOR EXTENDED PE MEMORY Provisions for a 9...

Страница 23: ...larly scheduled basis Since equipment maintenance will consist mainly of keeping the equipment clean the frequency of main tenance will depend to a large extent on the cleanli ness of the surroundings...

Страница 24: ...rmal Motor Neutral Engine Start N1 N2 E1 E2 T1 T2 P2 1 P2 3 P1 1 P5 1 P5 4 C C ELS NO NO NLS P5 3 P4 2 P4 1 51 52 P1 3 P1 2 P1 4 P3 1 P3 3 Figure 7 1 Wiring Diagram for Residential Automatic Transfer...

Страница 25: ...t soot grease moisture or corrosion contamination from the surface of the switching device using a dry soft lint free cloth dry soft bristle brush and vacuum cleaner Do not blow debris into circuit br...

Страница 26: ...Page 20 7 3 MAINTENANCE LOG I B ATS RM05 Effective 6 01 Date Action Ex 1 1 XX Changed Battery...

Страница 27: ......

Страница 28: ...tract between the purchaser and Cutler Hammer NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PAR TICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARISING FROM COURSE OF DEAL...

Отзывы: