Page 16

I.B. ATS-RM05

Effective 6/01

SECTION 6:  ADJUSTMENTS

6.1 PLANT EXERCISER PE TIMER

Option 23, described in Section 3.2, is a plant exerciser.
The plant exerciser is a once every 7-day timer switch
used to exercise the engine driven generator. 

6.1.1 TIMER PROGRAMMING

Depress the PE Switch located on the end of the printed
circuit board for 2 seconds and release.  Both Normal
and Emergency LEDs will flash twice indicating the plant
exerciser is now programmed correctly. The transfer
switch will initiate a test now and every seven days from
this time forward. If for some reason both power sources
are unavailable for longer than 20 seconds, the plant
exerciser will have to be reprogrammed when either
power source becomes available.  To cancel the plant
exerciser, depress the PE Switch for 4 seconds and
release.  Both Normal and Emergency LEDs will flash 4
times to indicate the plant exerciser is now disabled.
After the current exercise is complete the Transfer
Switch will transfer back to Normal. The plant exerciser
will now have to be reprogrammed in order to exercise
the generator.

6.1.2 PROVISIONS FOR EXTENDED PE MEMORY

Provisions for a 9 volt battery are included in all residen-
tial transfer switches to enhance the Plant Exerciser
memory duration. The 9 volt battery is not included. The
customer is not required to use this feature; the standard
20 second memory backup is integral to all residential
transfer switches. This provision provides backup power
to the microprocessor memory enabling it to retain the
Plant Exerciser set point for a maximum of 30 days with-
out any power on the transfer switch. The 30 day limit
may vary depending on the type and amount of charge
in the battery. It is recommended that the battery be
replaced yearly or after an accumulated number of out-
age hours equal to 30 days for maximum performance.

A typical condition that may use battery power would be
during a utility outage with a failure of the generator to
start. Please note, that even with the 9 volt battery provi-
sions, the built in 20 seconds Plant Option is still func-
tional on the board.

Содержание Cutler-Hammer RTHMFDA20100WSU

Страница 1: ...Effective 6 01 Supersedes ATS RMO4 dated June 2000 I B ATS RM05 Cutler Hammer Instructions for Cutler Hammer Residential Automatic Transfer Switch...

Страница 2: ......

Страница 3: ...S THAT CAN CAUSE DEATH OR SEVERE PERSONAL INJURY FOLLOW PROPER INSTALLATION OPERATION AND MAINTENANCE PROCEDURES TO AVOID THESE VOLTAGES TRANSFER SWITCH EQUIPMENT COVERED BY THIS INSTRUCTION BOOK IS D...

Страница 4: ...RECEIVING HANDLING AND STORAGE 2 1 Receiving 4 2 2 Handling 4 2 3 Storage 4 SECTION 3 EQUIPMENT DESCRIPTION 3 1 Introduction 5 3 2 Options 5 3 3 Standards 5 SECTION 4 INSTALLATION AND WIRING 4 1 Gener...

Страница 5: ...RM05 Page v Page SECTION 6 ADJUSTMENTS 6 1 Plant Exerciser PE Timer 16 6 1 1 Timer Programming 16 6 1 2 Provisions for Extended PE Memory 16 SECTION 7 MAINTENANCE 7 1 Introduction 17 7 2 Procedures 17...

Страница 6: ...8 4 4 Deadfront Removal 9 4 5 Cable Connections 9 4 6 Typical installation of a residential or light duty automatic transfer switch 11 4 7 Typical installation of a residential or light duty automatic...

Страница 7: ...must be strictly observed in the installation operation and maintenance of this device THE WARNINGS AND CAUTIONS INCLUDED AS PART OF THE PROCEDURAL STEPS IN THIS DOCU MENT ARE FOR PERSONNEL SAFETY AND...

Страница 8: ...gence necessary for the switch and related circuit operation 1 2 1 DESIGN CONFIGURATION The Cutler Hammer transfer switch is a rugged com pact design that utilizes molded case switches to trans fer es...

Страница 9: ...including the appropriate option which includes specially designed cleats transfer switches have a seismic capability which exceeds the worst case Zone 4 required levels per both the Uniform Building...

Страница 10: ...ating the mounting holes covers the entire opening Do not discard the packing material until the equipment is ready for installa tion Once the top packaging is removed from the shipment the enclosure...

Страница 11: ...s avail able If the emergency power source fails during timing the time delay is overridden and an immediate transfer to the normal power source will occur The TDEN timer is set for 7 minutes 3 3 STAN...

Страница 12: ...and re examination UL1087 employ a label service listing program which requires an extensive follow up testing program for list ed devices Standard UL1008 for automatic transfer switches lists devices...

Страница 13: ...sur face capable of supporting the weight of the enclosed transfer switch equipment Figure 4 1 30 100A or Figure 4 2 150 200A Avoid locations that are moist hot or dusty however there are enclosure de...

Страница 14: ...cover in place disconnect the 5 white plugs on the logic board Care should be taken when it is placed aside Remove the 4 screws from the bottom Dead Front and place it in a safe place Figure 4 4 Step...

Страница 15: ...on to the unit to ensure that conductors or cable insulation has not been damaged while being pulled into position Power cables are to be connected to solderless screw type lugs located on the transfe...

Страница 16: ...ion another typical installation for household loads can be considered Figure 4 7 Refer to Figure 4 9 for a household loads connection diagram 4 7 ENGINE START CONNECTION The engine control contact co...

Страница 17: ...n the emergency distribution 3 and the utility panel 4 Figure 4 7 Typical installation of a residential or light duty automatic transfer switch The switch 1 and generator 2 are connected to the power...

Страница 18: ...m of Typical Installation Critical Loads Only Figure 4 9 Diagram of Typical Installation All Household Loads Transfer Switch Circuit Breaker Watt Hour Meter Circuit Breaker Main Breaker Panel Emergenc...

Страница 19: ...With a lit tle bit of force push the screwdriver in on a slight angle toward the center of the clamp Be sure to slide it in until it clicks You will then see the clamp open in the wire hole Step 3 Onc...

Страница 20: ...vertop the metal rods of the terminal block Match the rounded edge of the plug with the rounded edge of the terminal block and gently push the pieces together The piece should snap when correctly in p...

Страница 21: ...GENCY to NORMAL position and the generator will shut down SECTION 5 FUNCTIONAL TESTING YOU ARE READY TO ENERGIZE THE EQUIPMENT VOLTAGES WITHIN THE ENCLOSURE ARE CAPA BLE OF CAUSING SEVERE PERSONAL INJ...

Страница 22: ...ete the Transfer Switch will transfer back to Normal The plant exerciser will now have to be reprogrammed in order to exercise the generator 6 1 2 PROVISIONS FOR EXTENDED PE MEMORY Provisions for a 9...

Страница 23: ...larly scheduled basis Since equipment maintenance will consist mainly of keeping the equipment clean the frequency of main tenance will depend to a large extent on the cleanli ness of the surroundings...

Страница 24: ...rmal Motor Neutral Engine Start N1 N2 E1 E2 T1 T2 P2 1 P2 3 P1 1 P5 1 P5 4 C C ELS NO NO NLS P5 3 P4 2 P4 1 51 52 P1 3 P1 2 P1 4 P3 1 P3 3 Figure 7 1 Wiring Diagram for Residential Automatic Transfer...

Страница 25: ...t soot grease moisture or corrosion contamination from the surface of the switching device using a dry soft lint free cloth dry soft bristle brush and vacuum cleaner Do not blow debris into circuit br...

Страница 26: ...Page 20 7 3 MAINTENANCE LOG I B ATS RM05 Effective 6 01 Date Action Ex 1 1 XX Changed Battery...

Страница 27: ......

Страница 28: ...tract between the purchaser and Cutler Hammer NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PAR TICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARISING FROM COURSE OF DEAL...

Отзывы: