O&M Manual for 40-1200A (480/600 Vac) ATC-900 3-Position, 

Open/Closed Transition Contactor Based Transfer Switch

10. Once the manual operation is complete and automatic opera-

tion is desired, connect the sources of power.

11. Check  for 120 Vac at J7-2 to J7-1 if Source 1 is available.

12. Check for 120 Vac at J7-4 to J7-3 if Source 2 is available. 

13. Insert the J7 connector into the controller.

14. Follow the testing procedure in Section 6 to ensure proper 

automatic operation. 

5.3 Automatic Transfer

The operating sequence of an ATS is dictated by the switch's 

standard features and selected options.  Operation of an ATS 

during Source 1 power source failure and Source 1 power source 

restoration will be described here with only standard options 

included on the switch.  Additional options, as described in Sec-

tion 3.5.2, can change sequences and timing, depending upon 

the options selected.  It is strongly suggested that you become 

familiar with additional options selected with the particular ATS 

and their effect on the normal operation of an ATS.

5.3.1 Source 1 Power Source Failure

Standard Source 1 power source failure is defined as a reduction 

or loss of voltage.  If this occurs, the sequence of operation is as 

follows.

1. Failure of Source 1 is detected by the controller intelligence.

2. When the controller detects a failure, the engine contacts 

close (after delay if programmed) and start the engine-driven 

generator.

3. When the Source 2 voltage reaches its operation rating, the 

K2 and K4 relays inside ATC-900 controller operate to start 

transfer operation to Source 2.  This operating sequence 

causes the contactor to open Source 1 and close on 

 

Source 2.

4. The load is now transferred to the Source 2 power source.

5.3.2 Source 1 Power Source Restoration

1. A return to the Source 1 power source begins when the volt-

age in all phases of a 3-phase sensing unit, or phase-to-

phase in a single sensing unit, is restored to a preset value.

2. At the preset voltage, K1 and K3 relays inside ATC-900 con-

troller operate to start transfer operation to Source 1.

3. During this sequence, the contactor opens Source 2 and 

closes on Source 1.

4. Simultaneously, the engine cool-down timer initiates the shut 

down of the engine driven generator.

5. Transfer of the load back to the Source 1 power source is 

now complete.

Section 6: Testing and Problem Solving

6.1 Testing

After the ATS equipment is initially installed or during planned 

outages, the installation should be tested to ensure that all equip-

ment operates properly.  This attention to detail will help avoid 

unexpected malfunctions.  Mechanical and/or electrical tests 

should be performed as described in this section.

The frequency of subsequent testing should be based on recom-

mendations of the Genset manufacturer.  Use the test pushbut-

ton on the ATC-900 controller to check the electrical operation of 

the switch.

  

WARNING

HIGH VOLTAGES ASSOCIATED WITH OPERATIONAL TRANSFER 

SWITCH EQUIPMENT PRESENT A SHOCK HAZARD THAT CAN 

CAUSE SEVERE PERSONAL INJURY OR DEATH.  USE EXTREME 

CAUTION TO AVOID TOUCHING ELECTRICAL CONNECTIONS 

WHENEVER INSPECTING OR TESTING THE EQUIPMENT.

IN ADDITION, IMPROPER OPERATION OF THE GENERATOR SET 

PRESENTS A HAZARD THAT CAN CAUSE SEVERE PERSONAL 

INJURY OR DEATH.  OBSERVE ALL SAFETY PRECAUTIONS IN YOUR 

GENERATOR SET OPERATIONS AND INSTALLATION MANUALS.

6.1.1 Mechanical and/or Electrical Testing

 

NOTICE

SINCE FEATURE 4 (TIME DELAY ENGINE COOL-OFF), AS 

DESCRIBED IN SECTION 3, IS A STANDARD FEATURE, AN ENGINE 

START SIGNAL WILL BE PRESENT FOR A PERIOD OF TIME WHEN 

THE SWITCH IS FIRST ENERGIZED.  THE PERIOD OF TIME IS EQUAL 

TO THE TIMER SETTING.  TO AVOID STARTING THE ENGINE DUR-

ING THIS TIME PERIOD, TURN THE GENERATOR CONTROLS TO 

THE OFF POSITION.

Energize the ATS equipment as described in Sections 6.1.2 

through 6.1.6.  Insure that all safety precautions are taken and 

that all 

WARNINGS

 and 

CAUTIONS

 are observed.

6.1.2 No Voltage Steps

With no voltage available on either power source, proceed as fol-

lows.

Step 1:

The generator engine start controls should be in the OFF 

position to prevent an undesired start.

Step 2:

Ensure that the ATS has been set to the proper applied 

system voltage (See Section 4.7).

Step 3:

Check all ATS loads to ensure that they are ready to be 

energized.

6.1.3 Connecting the Power Sources

Step 1:

Close the Source 1 power source upstream protection 

device.  

Step 2:

Connect the engine start battery cable.

Step 3:

With the emergency generator in the OFF position, close 

the Source 2 power source upstream protective device, 

assuming such a device used.

Содержание ATC-900

Страница 1: ...sition Contactor Based Transfer Switch Instruction Booklet Description Page Introduction 2 Receiving Handling and Storage 6 Equipment Description 7 Installation and Wiring 14 Operation 20 Testing and...

Страница 2: ...A It is provided as a guide for authorized and qualified person nel only Please refer to the specific WARNING and CAUTION in Section 1 1 2 before proceeding If further information is required by the p...

Страница 3: ...stored the ATS automatically transfers back and initiates generator shutdown In the event the Source 1 power source fails and the Source 2 power source does not appear the ATS remains connected to the...

Страница 4: ...ent catalog numbers provide a significant amount of relevant information that pertains to a particular piece of equipment The Catalog Number Identification Table Table 2 provides the required interpre...

Страница 5: ...applica ble setpoint ranges for the nominal voltage and frequency setting Source 2 Failed or Fails Source 2 is defined as failed when it is outside of its under voltage overvoltage underfrequency over...

Страница 6: ...o sure Care should be exercised however to protect the equip ment from impact at all times Do not remove the protective packaging until the equipment is ready for installation When the ATS equipment r...

Страница 7: ...POWER PANEL VOLTAGE SELECTION TRANSFORMER PANEL Figure 5A Three Basic Panels of an Open Transition ATS 1200A LOGIC PANEL POWER PANEL VOLTAGE SELECTION TRANSFORMER PANEL Figure 5B Three Basic Panels of...

Страница 8: ...North American market voltage selection panel consists of multi tap transformers contained in a steel case mounted in the transfer switch enclosure Figure 7 The cover has two connec tors on it with th...

Страница 9: ...oller has an operating temperature of 20 to 70 C 4 to 158 F The controller circuit board is protected by an insulating confor mal coating The specifications under normal operating conditions are as fo...

Страница 10: ...hieves a transfer between sources with no power interruption Both sources must be synchronized in fre quency phase and voltage before the transfer is initiated In phase transition is a feature that wi...

Страница 11: ...ad condition after a transfer from the generator source has been made Count down timing begins when the transfer is completed In applica tions where two generators are selected the same cool off timer...

Страница 12: ...Control This feature displays status information of a remotely located ATC 900 controller The HMI type Remote Annunciator will seri ally communicate with the ATC 900 over the Modbus 485 or Ethernet u...

Страница 13: ...ton ATS equipment enclosed in any of the enclosures listed in Table 3 is listed for application by UL and ULC In addition Eaton ATSs are listed in File E38116 by Underwriters Laborato ries Inc under S...

Страница 14: ...supporting the weight of the enclosed ATS equipment For standard ATSs avoid locations that are moist hot or dusty However Eaton offers optional enclosure designs that can be used in special environmen...

Страница 15: ...1A Typical Mounting of the ATS to a Mounting Surface Open Transition ATS for Wall Mounting Step 5 Double check to ensure that all packing and shipping materials have been removed Step 6 If Seismic Uni...

Страница 16: ...tion Verify that the lugs supplied will accommodate the power cables being used Also verify that the cables comply with local electrical codes Standard ATS equipment as supplied from the factory will...

Страница 17: ...ment is installed and operating properly 4 6 Engine Start Connection The engine control contact connections are located on the logic panel of the ATS Connect the engine start wires to the red ter mina...

Страница 18: ...232 J14 CT Earth Controller Ground J8 USB Front Panel Memory Stick Interface J11 I O Module s SW1 Modbus Terminator Module J13 RS 422 Interface Source Load Interface Switch Position Contacts For more...

Страница 19: ...he cover has two connec tors on it with the one on the right being selectable depending on the voltage applied to S1 and S2 The transformer unit is eas ily removed by removing the two front screws and...

Страница 20: ...OURCE 2 IF A GENERATOR CONTROL SELECTOR SWITCH TO THE OFF POSITION BEFORE ATTEMPTING A MANUAL TRANS FER To manually operate 1 Disconnect all sources of power 2 Disconnect the J7 connector from the ATC...

Страница 21: ...s on Source 1 4 Simultaneously the engine cool down timer initiates the shut down of the engine driven generator 5 Transfer of the load back to the Source 1 power source is now complete Section 6 Test...

Страница 22: ...ded for a preset time after transfer to the Source 1 power source is com pleted 6 1 5 Alternate Tests 1 Alternate operational tests may be possible depending upon the options provided with any given A...

Страница 23: ...to go to Source 1 Step 4 Depress the TRIP button located on the operating mechanism of the contactor to bring the contactor to neutral trip position Step 5 Depress the SELECT button located on the ope...

Страница 24: ...the structure area for safety hazards or potential maintenance problems Inspect the area especially where switching device is installed for any safety hazards including personnel safety and fire hazar...

Страница 25: ...at 68C8282H02 40 1200A Domestic Switch 480VAC 600VAC 4 Pole Cat 68C8282H02 Power Panel Close Transition Does not include Contactor 40 1200A Domestic Switch 480AC 600VAC 2 Pole Cat 69D8080H01 40 1200A...

Страница 26: ...LY SUGGESTED THAT THE FULL INSTRUCTIONS BE FOLLOWED FOR ALL INSTALLATIONS SET UP AND TESTING Step 1 Mount the ATS on a flat rigid surface Figure 18A 18B Shim if necessary Figure 18A Mounting Details O...

Страница 27: ...TAGE SELECTION PANEL LOGIC PANEL GROUND CONNECTION IB140036EN For more information visit www eaton com Instruction Booklet Effective October 2014 Page 27 O M Manual for 40 1200A 480 600 Vac ATC 900 3...

Страница 28: ...TION PANEL LOGIC PANEL GROUND CONNECTION For more information visit www eaton com IB140036EN Instruction Booklet Page 28 Effective October 2014 O M Manual for 40 1200A 480 600 Vac ATC 900 3 Position O...

Страница 29: ...e proper wire size as listed by the generator set Genset manufacturer For the I O connections there are some switches that the Inputs are wired to a terminal block while others are not When they are n...

Страница 30: ...ource 1 contactor Momentarily energize K3 N Is Source 1 available yet Y Source 1 is powering the load TDN timer times out if Option 32A is enabled TDN timer times out if Option 32A is enabled Source 1...

Страница 31: ...ad TDN timer times out if Option 32A is enabled TDN timer times out if Option 32A is enabled Source 1 is powering the load N Is Source 1 available yet TDEN timer times out Y Open Source 2 contactor En...

Страница 32: ...ww eaton com IB140036EN Instruction Booklet Page 32 Effective October 2014 O M Manual for 40 1200A 480 600 Vac ATC 900 3 Position Open Closed Transition Contactor Based Transfer Switch Figure 22 Close...

Страница 33: ...N For more information visit www eaton com Instruction Booklet Effective October 2014 Page 33 O M Manual for 40 1200A 480 600 Vac ATC 900 3 Position Open Closed Transition Contactor Based Transfer Swi...

Страница 34: ...information visit www eaton com IB140036EN Instruction Booklet Page 34 Effective October 2014 O M Manual for 40 1200A 480 600 Vac ATC 900 3 Position Open Closed Transition Contactor Based Transfer Swi...

Страница 35: ...N For more information visit www eaton com Instruction Booklet Effective October 2014 Page 35 O M Manual for 40 1200A 480 600 Vac ATC 900 3 Position Open Closed Transition Contactor Based Transfer Swi...

Страница 36: ...OF TRADE ARE MADE REGARDING THE INFORMATION RECOMMENDATIONS AND DESCRIPTIONS CONTAINED HEREIN In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence st...

Отзывы: