13
3.2 Package content
After opening the packaging, it is first necessary to check the contents.
The package must contain:
3.3 Connection
3.3.1 Installation requirements
Warning:
Installation must be performed by qualified personnel. The first
connection to perform is the protective conductor (earth cable),
which must be connected to the screw marketed
.
The UPS, when inserted in an installation, does not alter the existing
neutral (system earthing) arrangements.
UPS
USB cable
RS232 cable
Jumper
(15/20kVA models only)
User manual
Software CD
Содержание 9E 10000i
Страница 1: ...Eaton 9E 10000i 9E10Ki Eaton 9E UPS https eaton power ru catalog eaton 9e eaton 9e 10000i...
Страница 2: ...powerquality eaton com Eaton 9E 6 20kVA...
Страница 40: ...37...
Страница 41: ...38 614 06847 03...