Eaton 9395 UPS (450–825 kVA) Installation and Operation Manual
S
164201725 Rev 4
www.eaton.com/powerquality
7-1
Chapter 7
UPS Operating Instructions
This section describes how to operate the UPS.
NOTE
Before starting the UPS, ensure all installation tasks are complete and a preliminary startup has
been performed by authorized service personnel. The preliminary startup verifies all electrical
interconnections to ensure the installation was successful and the system operates properly.
NOTE
Read this section of the manual and have thorough knowledge of UPS operation before attempting
to operate any of the controls.
NOTE
The UPS displays 2 minutes of battery runtime at the initial startup. After a 24-hour charging period,
the UPS automatically runs a battery test and the correct battery runtime displays.
7.1
UPS Controls and Indicators
The controls and indicators identified and described in this section are used to control
and monitor UPS operation. Figure 7‐1 or Figure 7‐2 shows the controls and
indicators.
Control Panel
ISBM
AC Input Breaker CB1
(Optional)
(Not available with separate
rectifier feed option)
Figure 7‐1. UPS Controls and Indicators – Momentary Static Switch
Figure
Содержание 9395 UPS
Страница 2: ......
Страница 28: ...Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality 2 2...
Страница 134: ...Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality 5 20...
Страница 254: ...WARRANTY Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality W 2...
Страница 255: ......
Страница 256: ...1642017254 164201725 4...