Installation
Eaton 9315/9390/9395/9395P Fixed Primary Sync Control Installation and Operation Manual P-164000023—Rev 03
3-19
3.4
Installation and Wiring with an Eaton Power Xpert 9395 UPS
To install and wire:
1.
Install the Eaton Fixed Primary Sync Control panel to the selected mounting location.
See Figure 2-1 on page 2-2 for mounting hole dimensions and Figure 2-2 on page 2-3 for conduit entrance
locations.
2.
Unfasten the front door latches and swing the door open.
3.
Complete all control wiring interconnections using Table 3-8 for wiring requirements.
Figure 3-2 shows the Eaton Fixed Primary Sync Control TB1 terminal block and ground terminal locations.
Figure 3-3 shows the TB1 terminal block wiring detail.
Figure 3-15 through Figure 3-18 show the typical locations of the UPS TB3, TB6, and XSlot
®
Relay
Interface Card interconnect terminal blocks. Figure 3-14 shows the TB6 detail.
Refer to the applicable Power Xpert 9395 UPS Installation and Operation Manual listed in paragraph 1.3 on
page 1-4 for UPS cabinet terminal locations and assignments, termination requirements, conduit landing
locations, and terminal access instructions.
4.
Route wires through the strain relief bushing and connect to the terminals on the XSlot Relay Interface
Card in each of the UPS cabinets (see Figure 3-19 and Figure 3-20).
5.
Install the XSlot Relay Interface Card into an open XSlot communication bay on the front of the UPS (see
Figure 3-15, Figure 3-16, Figure 3-17, or Figure 3-18). Refer to the applicable Power Xpert 9395 UPS
Installation and Operation Manual for UPS cabinet access instructions.
6.
Verify the jumper is installed between Sync Control terminal TB140 and TB141 (see Figure 3-3).
7.
When all wiring is complete, close the door and secure the latch.
CAUTION
When connecting the bypass and load voltage from another model UPS to a Power Xpert 9395
UPS using the Eaton Fixed Primary Sync Control accessory, use Phase A, Phase B, and Neutral
connections from the other UPS. DO NOT connect the other model UPS Phase C bypass and load
voltage to the Sync Control connection point when connecting to an Power Xpert 9395 UPS.
NOTE
When installing wiring connections, conduit must be installed between the Eaton
Fixed Primary Sync Control and the UPS cabinet. Conduit also must be installed
between the Eaton Fixed Primary Sync Control and the customer's remote
monitoring system
NOTE
Complete the wiring to the XSlot Relay Interface Card terminals before installing the
cards in the Communication Bay in each of the UPS cabinets.
Содержание 9315P
Страница 1: ...Eaton 9315 9390 9395 9395P Fixed Primary Sync Control Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Eaton 9315 9390 9395 9395P Fixed Primary Sync Control Installation and Operation Manual...
Страница 8: ...This page intentionally left blank...
Страница 61: ......
Страница 62: ...P 164000023 2 P 164000023 3...