
7
4.2
Recommended positions
Place the Eaton 5E on a flat, stable surface in its final location. Always keep 6” or
150 mm of free space near UPS openings for ventilation.
Installation in tower position
4.3
UPS connection
4.3.1
Power supply connection
Check that the indications on the name plate located on the back of the UPS
correspond to the AC-power source and the true electrical consumption of
the total load.
Connect the UPS to the AC-power source with cable through a wall outlet equipped
with an earth connector, using your equipment cord.
1.
Disconnect the protected equipment, keep the power cable
2.
Connect IEC cable on protected equipment side.
3.
Connect IEC cable provided on UPS AC output side
4.
Connect the power cable to UPS AC inlet
5.
Connect the power cable to wall outlet