EasyPro Vianti Falls Скачать руководство пользователя страница 3

Optional: Steps 9-11 are for 

auto fill installation. Not all 

applications may need an 

auto fill, autofill kit  

#WFS37HB available.

9

Find the “Drill Point” 

mark on the front of the 

basin. The point/indent will 

be on the opposite side of 

the pump pocket from the 

installed 1" bulkhead fitting. 

A 1

1

/

4

" diameter hole should 

be drilled (centered on the 

“Drill Point”) to accommo-

date the 

1

/

2

" bulkhead fitting.

10

Install the 

1

/

2

bulkhead fitting 

as shown. Wrap male 

threads of fittings with 

Teflon tape. Install 

elbow into bulkhead 

fitting and thread the 

reducer bushing into 

elbow. Thread the 

barbed fitting into outer 

section of bulkhead 

to connect to 

1

/

2

" poly 

irrigation tubing (actual 

5

/

8

" ID tubing).

Float Switch Autofill Assembly

1

/

2

" x 

3

/

8

" Reducer Bushing

1

/

2

" Threaded Street Elbow

Threaded Bolt

Rubber Washer

Plastic Washer

Nut

Barbed Male 

Adaptor

11

Before installing the 

float switch auto fill, 

loosen the Phillips screw 

to place float in proper 

orientation. It may be 

necessary to remove the 

screw and move the brass arm 

which holds the float to the 

side as shown.  This will allow for easier adjustment of the float 

to proper water level. Then thread the float switch assembly 

into the reducer bushing. Adjust the brass rod and float to 

approximate level of desired water level. Final adjustment 

should be made when final water level is determined. 

Screw

12

Run the 1" black 

flexible PVC through 

the hole previously provided 

in the block wall. Carefully 

measure and cut PVC pipe 

to proper length. Take extra 

care to verify the spillway 

has remained in its level 

position while measuring 

and cutting the pipe.

13

Before gluing black 

flexible PVC pipe 

verify the factory installed 

fittings are tight. Then glue 

the black flexible PVC pipe 

into the 45 degree elbow 

that is pre-installed.

14

Assemble the pump 

discharge assembly 

onto the pump. Take care 

not to cross thread or 

over tighten the assembly 

onto the pump. Since this 

connection should always 

be below water, Teflon tape 

and over tightening is not 

required. Once the discharge 

assembly is installed onto the pump, carefully lower the 

pump and assembly into the pump chamber. Line up 

the pump discharge with the pre-installed fitting. Again 

ensure that the pre-installed fitting is tight. Connect the 

pump discharge to the pre-installed fitting with the rubber 

coupler. A nut driver or screwdriver should be used to 

tighten the clamps. Ensure that both clamps are tight.

15

After making sure 

all plumbing fittings 

are properly installed, fill 

the basin with water. The 

spillway should be tested 

for proper operation when 

the wall construction allows. 

Before final wall installation 

and covering the basin with 

rock, the proper flow of the 

water fall should be adjusted (if needed) with the ball valve 

on the pump discharge assembly.

16

Once proper 

adjustment of the 

spillway has be determined, 

put the pump cover in place. 

The power cord for the pump 

can run through the notch in 

the pump cover. The pump 

cover can be placed in 

position as shown or reversed.

17

Finish construction 

of the block wall and 

any other decorative stone 

covering the basin. Be sure 

to leave rock off the area of 

the splash mat on the basin 

where the water naturally 

wants to fall. This will reduce 

splash and help retain water in the basin.

Teflon is a registered trademark of DuPont.

Содержание Vianti Falls

Страница 1: ...B EX LED35CB blue light HB23KW EX LED23W warm white light HB35KW EX LED35W warm white light 1 Flexible black PVC pipe 8 10 Pump discharge assembly with ball valve 1 1 PVC Glue 4 oz 1 1 1 PVC male adaptor mpt x slip 2 1 extra 3 1 extra 1 PVC Tee slip x slip x slip 1 1 PVC 90 deg elbow slip x slip 2 1 extra 3 1 extra 14 x 39 Splash Mat for EX kits only 1 EX kits only 1 EX kits only Vianti Falls kits...

Страница 2: ...D light bar should fit snuggly into the back of the spillway If necessary a small amount of silicone can be used as an adhesive to hold the bar in place 5Depending on the look desired the block that goes around the spillway may need to be cut to ensure proper leveling and look of the spillway in the wall The type of block being used will determine the method used A lentil may be required for longe...

Страница 3: ...level position while measuring and cutting the pipe 13Before gluing black flexible PVC pipe verify the factory installed fittings are tight Then glue the black flexible PVC pipe into the 45 degree elbow that is pre installed 14Assemble the pump discharge assembly onto the pump Take care not to cross thread or over tighten the assembly onto the pump Since this connection should always be below wate...

Страница 4: ...CULAR PURPOSE ARE HEAREBY LIMITED IN DURATION TO THE DURATION OF THE WARRANTY AS DESCRIBED ABOVE Some States do not allow limitations on how long an implied warranty lasts so the above limitations may not apply to you EasyPro shall not be held liable for any damages caused by defective components or materials of this Product or for loss incurred because of the interruption of service or any conseq...

Отзывы: