EasyPro Vianti Falls Скачать руководство пользователя страница 2

1 

Determine the placement 

of the Vianti Falls system. 

Prepare the base for the 

48" half basin by properly 

compacting and leveling the 

area. The Vianti Falls spillway 

is designed to be placed 

approximately 12" to 30" 

above the basin. The center 

of the spillway and the basin 

must be aligned. The spillway 

must be positioned in the wall 

to allow for the lip to protrude 

past the wall 1

1

/

4

" (assuming 

the wall is plumb). This is to 

ensure water will land in the 6" 

x 39" splash mat included with the basin. Extended lip kits 

come with 14" x 39" additional splash mat to be installed 

on top of basin (see page one).

Splash

Mat

1

1

/

4

"

2

When building the 

block wall, a section 

of wall must be left out to 

accommodate the plumbing 

and electrical cord for the 

pump. The notch in the back 

of the basin is for the power 

cord of the pump. If an auto 

fill line is being installed a 

section of wall should also 

be open to accommodate 

the auto fill feed line.

Power

Cord

Notch

Hole for 

Plumbing 

and Pump 

Power Cord

3 

Once the spillway 

placement has been 

determined in the block wall, 

the block will need to be cut 

to allow for the plumbing 

connections on the back of 

the spillway. Use appropriate 

tools and extreme care when 

cutting block. Consult block 

manufacturer recommendations 

for properly cutting block

being used.

4

If the lighting option is purchased the LED light strip 

can be fitted into the back of the spillway. There are 

brackets on the ends of the light bars with holes in them. 

These brackets are for other applications. The LED light 

bar should fit snuggly into the back of the spillway.

If necessary, a small amount of silicone can be used as an 

adhesive to 

hold the bar 

in place.

5

Depending on the look 

desired, the block that 

goes around the spillway 

may need to be cut to 

ensure proper leveling and 

look of the spillway in the 

wall. The type of block 

being used will determine 

the method used. A lentil 

may be required for longer 

spillways or in walls that 

would require additional 

weight bearing support. Consult a qualified professional 

for specific installation requirements and codes.

The spillway should be “dry fit” to ensure the spillway is 

level from side to side and front to back.

6

Once the spillway is 

level and “dry fit” the 

plumbing can now be 

fitted. Use the1" PVC male 

adaptor and the fittings 

provided to connect 

spillway to the flexible PVC 

pipe. Wrap the threads 

of the PVC male adaptor 

with Teflon tape and thread 

into the spillway inlet(s). 

Determine the placement of additional fittings (elbows, 

tees, and extra pipe). Cut and glue all the pieces together 

to fit the application.

7

The dual inlet units can be supplied with one mainline.  

Picture is for illustration only. Application may vary 

from image shown. After the mainline is split into two, the 

plumbing lengths to the spillway inlets should be equal.  

This will ensure equal flow rates to both inlets, while being 

able to control the overall flow with a single ball valve.

8

The cord for the LED light 

strip can be tucked into 

the notch in the spillway.

A dab of silicone should be 

used to seal the notch on 

opposing side. Tuck the cord 

between the blocks to run 

the cord to the power source. 

Ideally, run cord through 

conduit for future maintenance or removal of light strip.

Содержание Vianti Falls

Страница 1: ...B EX LED35CB blue light HB23KW EX LED23W warm white light HB35KW EX LED35W warm white light 1 Flexible black PVC pipe 8 10 Pump discharge assembly with ball valve 1 1 PVC Glue 4 oz 1 1 1 PVC male adaptor mpt x slip 2 1 extra 3 1 extra 1 PVC Tee slip x slip x slip 1 1 PVC 90 deg elbow slip x slip 2 1 extra 3 1 extra 14 x 39 Splash Mat for EX kits only 1 EX kits only 1 EX kits only Vianti Falls kits...

Страница 2: ...D light bar should fit snuggly into the back of the spillway If necessary a small amount of silicone can be used as an adhesive to hold the bar in place 5Depending on the look desired the block that goes around the spillway may need to be cut to ensure proper leveling and look of the spillway in the wall The type of block being used will determine the method used A lentil may be required for longe...

Страница 3: ...level position while measuring and cutting the pipe 13Before gluing black flexible PVC pipe verify the factory installed fittings are tight Then glue the black flexible PVC pipe into the 45 degree elbow that is pre installed 14Assemble the pump discharge assembly onto the pump Take care not to cross thread or over tighten the assembly onto the pump Since this connection should always be below wate...

Страница 4: ...CULAR PURPOSE ARE HEAREBY LIMITED IN DURATION TO THE DURATION OF THE WARRANTY AS DESCRIBED ABOVE Some States do not allow limitations on how long an implied warranty lasts so the above limitations may not apply to you EasyPro shall not be held liable for any damages caused by defective components or materials of this Product or for loss incurred because of the interruption of service or any conseq...

Отзывы: