9
Installation
Location
The air conditioner should be
placed on a fi rm foundation to
minimize noise and vibration. For
safe and secure positioning, place
the unit on a smooth, level fl oor
strong enough to support the unit.
The unit has casters to aid
placement, but it should only be
rolled on smooth, fl at surfaces.
Use caution and protect fl oors when
rolling over wood fl oors. Do not
attempt to roll the unit over objects.
The unit must be placed within
reach of a properly rated grounded
socket.
Never place any obstacles around
the air inlet or outlet of the unit.
Do not use extension cords with this
appliance.
The appliance requires at least 20
inches (50 cm) of clearance on the
back.
Tools for window kit installation
1. Screwdriver (medium size, Phillips)
2. Tape measure or ruler
3. Knife or scissors
4. Saw (In the event that the window kit needs to be
cut down in size)
See www.danby.com for general instruction guide
Содержание EPA080BAUW
Страница 9: ...7 Installation Front Rear Features ...
Страница 13: ...11 Installation Installation in a double hung sash window adapter ...
Страница 14: ...12 Installation Installation in a sliding sash window adapter ...
Страница 34: ...32 Instalación Vista frontal Vista posterior J J J Caracteristicas ...