![Eastwood 20629 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/eastwood/20629/20629_instructions-manual_522775004.webp)
4
Eastwood Technical Assistance: 800.544.5118 >> [email protected]
ASSEMBLY
1.
Select a clean, level work surface with clear access to Handle and sufficient room to manipulate workpieces through the Jaws.
2.
With the (2) 3/8” holes in the baseplate as a guide, mark the locations and centers on
a piece of paper with a pencil.
3.
Transfer the hole locations then drill (2) 1/2” [12mm] mounting holes in work surface.
NOTE:
A minimum thickness of 3/16” steel or 1/2” of a wood-based surface is
strongly recommended.
4.
Use (2) 3/8”-16 bolts (not included) washers and nuts to secure baseplate
to work surface.
5.
Place Handle
[B]
into bore in Fulcrum Lever
(FIG 1)
so that the annular groove
is positioned under the Set Screw.
6.
Using a 3mm Hex Key (not included) tighten Set Screw in Fulcrum Lever to
retain Handle
(FIG 1)
.
The Eastwood Shrinker Stretcher consists of moderately heavy metal components which can be present a hand/finger pinch hazard
and cause potentially serious injuries if dropped on feet. Avoid pinching hands while handling parts during use and wear thick,
well-fitting work gloves to prevent cuts from handling sharp metal. The use of safety shoes is strongly recommended.
Avoid pressing the Jaws together accidentally without a workpiece or permanent damage to Jaw teeth can occur.
Remove Handle when not in use.
Tremendous external torque loads are placed on this Shrinker Stretcher during operation. This tool cannot be operated without
adequate support or severe personal injury or property damage can occur if it should suddenly become dislodged or moves
while in use. Before beginning ANY work with this tool, it is absolutely necessary that it be securely bolted to a heavy, sturdy,
anchored workbench.
FIG. 1
Fulcrum Lever
✓