Step 3. Installation of chain.
After you installation of the woking table was finished, conbine the chain with the sprocket of main motor and
3 riwind shaft, on of them out side the cabinet as below shows.
Step 4. Check and fasten all the screws on machine.
Step 5. Adjust the height of the table by (10).
Adjust the height of the machine height by (12)
Note:
in order to make machine balance in both left and right, please level machine well,
the method of
level machine, please refer to
Chapter 7.
5.3 Notice
1.
Check whether all screws in machine are loose or not, tighten them if loose.
2.
As the equipment is heating machinery, the machine should be used at environment of ventilating, dry
and noncorrosive gas. Make sure no inflammable and explosive materials around the machine.
3.
The crust of machine must be grounded separately.
4.
Choose power wire which has section above 6 square millimeters.
5.
Keep the machine in level while installation. Use level meter to check if the machine is level.