5. Installation
Machine should be placed in empty space with flat ground, good ventilation and dry working environment.
5.1 Unpacking
(1)
Remove the iron nail
(2)
Loosen the screw on the packing
(3)
Take away the top cover by hammer and crowbar
(4)
Pull down the wooden side covers
(5)
Take out the working table and axles
(6)
Use forklift to move the machine to ground.
5.2 Installation of worktable
SOT-H Exploded Drawing:
https://www.dropbox.com/sh/8tk4tzjlhh6u1cx/AAApygQ2b6UQJ3tA6xMVM-aua?dl=0
Notice: 2 operators needed, and before all the parts installed, please keep all the screws not tightly locked.
Step 1. Installation of the main structure.
Fix the two side stands to left and right cabinet separately (refer to the image above), and then two operators
respectively connect support frame with it to keep working table stable.
Step 2. Installation of structure bar and table top.
Install other shafts and bars in according to the numbered sticker which indicate the combination of shaft and
its mounting position.