5B6729 – May 1997
73
Replenishment Solutions
Mixing the Developer and Fixer Solutions
Important
• See Table
on Page
to determine which type of chemicals to use with the selected cycle.
• When mixing chemicals, follow all instructions and precautions.
• Do not mix more than a 2-week supply of developer and fixer replenisher.
[1] To ensure that replenishment does not occur while the solutions are being mixed, move the Main Circuit Breaker
CB1 to the “OFF” position.
[2] Determine which type of chemicals is needed for the film processing cycle that you selected. See the table on
Page
[3] Following all directions provided with the solutions, mix at least 19 litres (5 gallons) of each solution.
Filling the Processor Tanks
Figure 11
Checking the Positions of the Racks
[1] Check that the Racks are in the correct positions.
[2] Close the Developer and Fixer Drains. See Figure
on Page
Important
The Replenishment Pumps automatically start when the Processor is turned on, but will not fill the Processor Tanks.
[3] Move the main Circuit Breaker CB1 to the “ON” position.
[4] Wait for the Walk-Up Menu to appear on the Display Panel.
H148_0009BA
H148_0009BCB
Feed Tray
Crossover
Detector
Crossover
Developer/Fixer
Crossover
Fixer/Wash
Assembly
Squeegee