Maintenance 29
Take the belt off the machine.
Install the new belt around the drive and idler pulleys.
While the belt is still loose connect the ends by lining up the zipper and replacing the
copper connecting pin.
From underneath push the idler pulley back into the up position to tighten the belt.
Connecting Pin
Drive Belt
Содержание BB-2
Страница 1: ...BB 2 Industrial Case Taping System User Guide...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ...8 Safety...
Страница 20: ...20 Installation and Setup...
Страница 22: ...22 Installation and Setup...
Страница 24: ...24 Adjustments...
Страница 30: ...30 Maintenance Plug in and turn on the BB 2 Case Taper to resume taping Drive Pulley Idler Pulley Idler Pulley...
Страница 50: ......