12
Attention
The waste materials of unpacking should be disposed to meet the demand for environmental
protection.
3.3 Main cabinet installation
Two installation modes are available: tower installation and rack installation,
depending on available space and user considerations. You can select an appropriate
installation mode according to the actual conditions.
3.3.1 Tower Installation
Various installation configurations are available: single UPS, single UPS with single
or multiple battery cabinets. Their installation methods are all the same.
The installation procedures are as follows:
Step 1: Take out the support bases from the accessories. Their appearances are shown
in Fig.3-1.
Fig.3-1 Support bases
Step 2: If optional external battery cabinets are connected to the UPS to provide
additional battery run time, assemble the spacers and the support bases, as shown in
Fig.3-2.
Fig.3-2 Installing support bases with spacers
Step 3:Place the UPS (and battery cabinet) on the support bases. Each UPS needs two
pairs of support bases to install, as shown in Fig.3-3.
Fig.3-3 Tower installation
Содержание EA990RT G5 10
Страница 4: ......