User Manual 200 kVA-1200 kVA UPS
3 Installation
16
Fig. 3-1 Clearance dimensions
If the user buys 1000 kVA/1200 kVA, same clearance is reserved at left and right sides.
3. 1. 2 Installation Tools
To ensure safety, the installation tools for hot-line work should be insulated. The installation tools that may be
involved in the installation process are shown in Table 3-3 and are used as needed.
Table 3-3 Installation tools
Tool name
Main function
Tool name
Main function
Forklift
Handle UPS
Nail hammer
Knock, install and remove
components
Herringbone ladder
High-place operation
Rubber hammer
Knock and install components
Clip-on ammeter
Current test
Cable drilling tool, drill Drill
Multimeter
Test electrical connection
and electrical parameter
Insulating tape
Electrical insulation
Cross screwdriver
Tighten screws
Heat-shrinkable T bush
electrical insulation
Levelling instrument Levelling
Heat gun
Heat heat-shrinkable T bush
Insulated monkey
wrench
Tighten and loosen bolts
Electrician's knife
Wire stripping
Insulated torque
spanner
Tighten and loosen bolts
Cable ties
Cable tying
Crimping pliers
Connect cold-pressed
terminal
Leather working gloves Protect the operator’s hands
Hydraulic tongs
Connect OT terminal
Anti-static gloves
Anti-static
Diagonal pliers
Cut cables
Insulating gloves
Insulating
Wire stripper
Wire stripping
Insulating shielding shoes Protect the operator
500 mm
1000 m
m
No clearance
500 mm recommended