EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS--- ETL LISTED                                  

16

 

IMPORTANT:  PLEASE READ 

BEFORE FIRING OVEN. 

 
 

PRE-ASSEMBLED OVEN CURING 

 

Pre-assembled  ovens  are  pre-cured  at  the  factory;  however  a  two  day  curing 
process  is  required  before  using  the  oven.  Oven  curing  is  a  process  of  removing 
moisture  from  the  oven  that  has  accumulated  during  the  oven  installation.  This 
process consists of two small fires; One fire each day for one hour, for a total of 
two  days.  (You  can  also  do  one  fire  in  the  morning  and  one  in  the  late  evening) 
When  curing,  each  of  the  fires  should  lightly  touch  the  dome  of  the  oven.  After 
one hour let the fire burnout and close door. Do not be alarmed if the temperature 
gauge is not moving, this is normal and is due to the moisture in the stone.  If you 
still  see  moisture  from  the  oven  you  may  need  to  cure  the  oven  for  a  few  more 
days.  Improper curing may cause small pieces of the oven to pop.  Although this 
is not harmful to the oven in anyway, please follow these procedures. 
 

Содержание 90-PAGW

Страница 1: ...1 TELEPHONE 800 840 4915 818 553 1134 FAX 818 553 1133 www earthstoneovens com e mail info earthstoneovens com A MAJOR CAUSE OF OVEN RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES AIR SPACES...

Страница 2: ...Table of contents Page Instructions for moving and lifting oven NEXT PAGE Parts list 1 Installation procedures written portion 2 5 Required clearances and air gaps 6 Exhausting 4 6 8 Operating instru...

Страница 3: ...y place forks through inside of tube steel supports legs and position under horizontal tube steel members Slowly lift and move oven as needed See dia A 2 USING A PALLET JACK Determine if pallet jack c...

Страница 4: ...MBLED INSTALLATION INSTRUCTIONS ETL LISTED 1 LIST OF SUPPLIED ITEMS OVEN ADDITIONAL ITEMS CAST ALUMINUM DOOR DIAL TEMPERATURE GAUGE FOR WOOD FIRE OVENS DIGITAL THERMOMETER FOR GAS FIRE OVENS REQUIRES...

Страница 5: ...uct In most areas this will include a permit to construct the oven and a permit for the exhaust system Sometimes an electrical permit is also necessary for connecting the exhaust fan All construction...

Страница 6: ...act with hearth is restricted to pizzas and bread products only Refer to manufacture for other foods 3 The manual recommends the use of untreated wood only no more than four pieces at a time 4 Burn in...

Страница 7: ...ing WARNING DO NOT PACK REQUIRED AIR SPACES WITH INSULATION OR OTHER MATERIALS A minimum of 3 inches must be maintained between any combustibles and the top of the metal covering over the oven enclosu...

Страница 8: ...ored in the same room as the oven Refer to NFPA 96 for wood storage requirements OVEN CURING PA PAG and PAGW ovens are pre cured however the first two fires should be small in order to properly cure t...

Страница 9: ...E DIAMETER MODEL 60 33 X 32 MODEL 90 50 MODEL 110 58 MODEL 130 70 MODEL 160 86 ALL CLEARANCES SPECIFIEDARE THE MINIMUM REQUIRED AIR SPACES WARNING DO NOT PACK REQUIRED AIR SPACES WITH INSULATION OR OT...

Страница 10: ...EARTHSTONE OVENS PRE ASSEMBLED INSTALLATION INSTRUCTIONS ETL LISTED 7 4 to 6 conc Floor slab Embed 4 min Oven stand Base plate Dia Anchors Coat with Simpson s epoxy FIGURE 17 A...

Страница 11: ...CTIONS CONTACT LOCALAU THORITY HAVING JURISD ICTI ON REGARDING FIRE RATED DUCT SHAFT NOTE OTHER U L LISTED SYSTEMS MAY BE SUBSTITUTED FOR THE METALBESTOS SYSTEM DEPICTED IN T HIS DIAGRAM TO MAINTAIN T...

Страница 12: ...OKE SPILLAGE WHEN REMOVING DOOR FROM IN FRONT OF DOOR OPENING SLIDE DOOR OUT 2 3 INCHES FROM OPENING AND THEN WAIT 15 SECONDS BEFORE REMOVING DOOR COMPLETELY FLARE UPS CAN OCCUR WHEN DOOR IS OPENED SU...

Страница 13: ...e being set into the oven h When finished cooking spread remaining embers on the floor of the oven hearth Close door against door opening This will clean the oven floor 9 CAUTION Many structure fires...

Страница 14: ...emoval of both creosote and grease from flues and ducts should be contracted to do the inspection and cleaning The inspection and cleaning schedule must be adjusted as needed to prevent the buildup of...

Страница 15: ...ven may cause negative pressure servicing proper operation If this area is to be covered with a facade it must be of a non combustable material Temperature gauge and On off switch can be extended to a...

Страница 16: ...on Proper installation Roof False Ceiling Air flow Air flow 24 x24 opening needed for combustion air Only one intake should be installed located in the front or back of oven Gas Burner system Air flow...

Страница 17: ...ressure below where the gas burner islocated The air underneathwill travel towards the air flow above creating a suction which will force the gas flame downwards To prevent this a non combustable lid...

Страница 18: ...ISTED 15 Expansion cracks due to the refractory mass are normal in the front entrance and on any interior surface This will not effect the performance efficiency and longevity of the oven in any way N...

Страница 19: ...ll fires One fire each day for one hour for a total of two days You can also do one fire in the morning and one in the late evening When curing each of the fires should lightly touch the dome of the o...

Страница 20: ...is due to the moisture in the stone If you still see moisture from the oven you may need to cure the oven for a few more days Improper curing may cause small pieces of the oven to pop Although this is...

Страница 21: ...2 to 3 hours Model 130 5 6 hours Model 160 6 8 hours Larger ovens models 130 160 used in restaurants will heat much faster after the first initial heat up The large mass needs at least 2 3 days of fir...

Отзывы: