OPERATOR INSTRUCTIONS ANd PARTS
CRT Models 6015V, 6015VCE, 6015BCE
Page 12
GetEarthquake.com
800-345-6007
dEPTh REGULATOR LEvER
Tilling depth is controlled by the height of the depth regulator lever.
To adjust tilling depth. (SEE FIGURE 4)
1. Remove detent pin.
2. Raise the depth regulator lever to position tines at chosen tilling depth.
3. Align hole in depth regulator lever with hole in depth regulator bracket
and replace detent pin.
depth regulator Lever down = Shallower tilling. Place the detent
pin in the top hole of the depth regulator lever for shallowest tilling.
depth regulator Lever Up = Deeper tilling. Place the detent pin in the
bottom hole of the depth regulator lever for deepest tilling.
BELT TENSION AdjUSTMENT
Proper belt tension is critical to good performance. After 1/2 hour of
operation, all cables may have to be adjusted due to initial stretch.
Thereafter, check tension after every 2 hours of operation.
to increase belt tension: (SEE FIGURE 5)
1. Loosen upper jam nut. Turn nut up cable in 1/8” increments.
2. Tighten lower jam nut.
3. Check adjustment.
This procedure can be repeated until conduit adjustment bolts are fully
adjusted. If no more adjustment can be made, belt may have to be replaced.
dO NOT AdjUST TILLING dEPTh UNLESS dRIvE
SAFETY CONTROL LEvER IS RELEASEd TO NEUTRAL
POSITION.
ALWAYS SET ThE dEPTh REGULATOR LEvER IN ThE
TRANSPORT POSITION BEFORE STARTING ENGINE,
ThAT IS, PLACE ThE dETENT PIN IN ThE hIGhEST hOLE
OF ThE dEPTh REGULATOR LEvER.
WARNING
!
depth regulator
bracket
depth regulator lever
detent pin
FIGURE 4
FIGURE 5
drive safety control lever disengaged
forward cable
upper jam nut
lower jam nut
1/4” stretch