SCW-410-QS (05/12)
Disclaimer
Proper installation and servicing of the EarthLinked
®
Heating and Cooling System is essential to its
reliable performance. All EarthLinked
®
systems must be installed and serviced by an authorized,
trained technician who has successfully completed the training class and passed the final
examination. Installation and service must be made in accordance with the instructions set forth in
this manual and the current
EarthLinked Heating and Cooling Systems Installation, Operation and
Maintenance Manual.
Failure to provide installation and service by an authorized, trained installer
in a manner consistent with the subject manuals will void and nullify the limited warranty coverage
for the system.
READ THE CURRENT EarthLinked Heating and Cooling Installation, Operation and
Maintenance Manual FOR COMPLETE INSTALLATION DETAILS.
Earthlinked
Technologies shall not be liable for any defect, unsatisfactory performance, damage or
loss, whether direct or consequential, relative to the design, manufacture, construction, application
or installation of the field specified components.
Earthlinked Technologies, Inc.
4151 South Pipkin Road
Lakeland, Florida 33811
tel. 863-701-
0096 ● fax 863-701-7796
info@earthlinked
CSI # 23 80 00
Содержание SCW Series
Страница 8: ...SCW 410 QS 05 12 Page 8...
Страница 9: ...SCW 410 QS 05 12 Page 9 Figure 5 SCW Connections for R 410A...
Страница 10: ...SCW 410 QS 05 12 Page 10 Figure 6 SCW Internal Flow Schematic...
Страница 11: ...SCW 410 QS 05 12 Page 11 Figure 7 SCW Piping...
Страница 15: ...SCW 410 QS 05 12 Page 15 Figure 10 SCW Electrical Ladder Diagram 230 1 60...
Страница 16: ...SCW 410 QS 05 12 Page 16 Figure 11 SCW Electrical Schematic 230 1 60...
Страница 17: ...SCW 410 QS 05 12 Page 17 Figure 12 SCW Series 230 3 60 Electrical Ladder Diagram...
Страница 18: ...SCW 410 QS 05 12 Page 18 Figure 13 SCW Series 230 3 60 Electrical Schematic...
Страница 19: ...SCW 410 QS 05 12 Page 19 Figure 14 Part 1 of 2 SCW Field Wiring Diagram Reference Figure 8...
Страница 20: ...SCW 410 QS 05 12 Page 20 Figure 14 Part 2 of 2 SCW Field Wiring Diagram Reference Figure 9...
Страница 28: ...SCW 410 QS 05 12 Page 28 Figure 21 Charging and Superheat Adjustment Process...