CCA-410-IM (03/15)
Page 15
Figure 8d. TXV Control Box Mounting Positions
The following steps and positioning requirements apply to installing the TXV Control to the cased coil for
vertical and horizontal applications. The vertical installation provides an illustrated example.
Step 1:
Relieve the nitrogen holding charge on the air handler using the valve on the liquid line stub out.
Locate the TXV Control box within the 3-1/2 feet of the suction line stub out on the cased coil.
Fasten
the TXV control box above the suction line stub out.
Содержание CCA Series
Страница 1: ...CCA 410 IM 03 15 Page 1 EarthLinked CCA Series Cased Coils Installation Manual ...
Страница 10: ...CCA 410 IM 03 15 Page 10 Figure 6 Cased Coil and Air Handler Line Set Separation ...
Страница 18: ...CCA 410 IM 03 15 Page 18 Figure 11 Clamping the Thermal Bulb Figure 12 Insulating the Thermal Bulb ...
Страница 22: ...CCA 410 IM 03 15 Page 22 ...
Страница 23: ...CCA 410 IM 03 15 Page 23 ...
Страница 24: ...CCA 410 IM 03 15 Page 24 Appendix B CCA Series CE Parts List ...
Страница 25: ...CCA 410 IM 03 15 Page 25 ...
Страница 26: ...CCA 410 IM 03 15 Page 26 ...