EarthCore Isokern Magnum 86072 Series Скачать руководство пользователя страница 3

General Information

 

The  EPA  Phase  2  qualified  Standard  Series  fireplace 

system  is  a  prefabricated,  refractory  modular  fireplace  and 

chimney  system  designed  for  field  assembly.  The  system 

consists of interlocking precast parts which are glued together 

with a masonry adhesive.

 

The parts of the EPA Phase 2 qualified Standard Series 

fireplace system and DM 54 chimney system are precast using 

a proprietary mixture of volcanic pumice aggregate and cement. 

It includes all the parts necessary for assembly of a complete 

firebox, smoke dome and chimney system.

 

Each EPA Phase 2 qualified Standard Series fireplace 

component is designed for a specific part of the fireplace such 

that only one means for assembly is possible.

 

The EPA qualified model requires an in-line or 

chimney top damper. 

 

The  EPA  Phase  2  qualified  Standard  Series  fireplace 

system requires a EPA Phase 2 qualified Standard Series fireplace 

refractory fire brick liner be applied to the interior of the firebox. 

Fire brick must be a minimum thickness of one and one-eighth 

inch (1-1/8”). 

 

The  EPA  Phase  2  qualified  Standard  Series  fireplace 

system is available in one size: thirty-six inch (36”). This unit 

has a thirty inch (32”) rough opening height before fire brick. 

 

The DM 54 chimney system is a dual module refractory 

chimney system. The basic chimney consists of an outer casing 

block  and  an  inner  liner  with  a  fourteen  inch  (14”)  diameter 

flue hole. The chimney components are field assembled using 

Earthcore Mortar to glue the components together.

 

The  DM  54  chimney  system  also  includes  an  offset 

chimney block component, used to create offsets to the vertical 

run of the chimney. A brickledge component is available, 

designed to support chimney top brick veneer finishes.

Prefabricated masonry chimney termination caps are also 

available.

 

The  various  EPA  Phase  2  qualified  Standard  Series 

fireplace  system  components  will  be  described  and  illustrated 

in the following pages. Close attention should be paid to each 

component group’s specifications and installation requirements 

as described in this manual.

Important: Due to heat and weight issues, the EPA Phase 2 

qualified Standard Series fireplace installations require that the 

system be built upon a non-combustible concrete slab with no 

wood underpinnings supported to footings with concrete or steel 

and designed to carry the total weight of the Isokern fireplace 

and chimney system.

 

The Fire-Lite application of the EPA Phase 2 qualified 

Standard Series fireplace  fireplace is designed to be built upon a 

combustible floor system and will also require a design that will 

support  the  total  weight  of  the  Isokern  fireplace  and  chimney 

system. The FTF-13 or equivalent chimney system only must be 

used with the Fire-Lite application. 

 

Chimney system installations over 57’ - 0” will require 

additional support. 

3

Содержание Isokern Magnum 86072 Series

Страница 1: ...g manufacturer s explicit installation sizing and operation instructions It is the responsibility of the general contractor to provide adequate clearances from all firebox surfaces as specified in thi...

Страница 2: ...List and Dimensions Isokern Standard Series Component List and DImensions Magnum Series Component List and Dimensions Magnum 86072 Series Required Clearance to Combustibles Assembly Instructions Isok...

Страница 3: ...consists of an outer casing block and an inner liner with a fourteen inch 14 diameter flue hole The chimney components are field assembled using Earthcore Mortar to glue the components together The D...

Страница 4: ...s eg burning construction debris or other highly flammable material tossing kicking or otherwise forcing logs into the firebox EPA Phase 2 qualified Standard Series fireplace and DM 54 chimney systems...

Страница 5: ...of air during the normal firing process In the event the home is tightly sealed and has modern energy efficient features the optional combustion air supply kits may not provide all the air required to...

Страница 6: ...Warnock Hersey Listing Label Facsimile 6...

Страница 7: ...n a permit EPA Yellow Phase 2 Qualifying Hangtag 7 MANUFACTURER EARTHCORE INDUSTRIES LLC MODEL NO Series 36 C PARTICLE EMISSIONS 2 93 GRAMS KG OF WOOD BURNED For proper operation catalyst must be repl...

Страница 8: ...4 C 5 2 3 4 G 69 3 4 69 3 4 37 1 4 69 3 4 WEIGHT 1300 lbs 1420 lbs 1600 lbs 3 10 3 4 Catalyst 56 W x 71 H x 29 1 2 D MINIMUM FRAMING 46 W x 71 H x 29 1 2 D 52 W x 71 H x 29 1 2 D C 33 43 33 48 36 42...

Страница 9: ...ually seen coming out of a chimney is essentially a combination of unburned fuel carbon and hydrogen and moisture in the form of water vapor The Catalytic Combustor system is a technology that provide...

Страница 10: ...Model A 36 43 Smoke Dome Small Part No Model Qty No 12 36 2 Smoke Dome Medium Part No Model Qty No 11 46 2 Side Wall Part No Model Qty No 20 36 6 Back Walls Part No Model Qty No 25 36 3 Model A 36 26...

Страница 11: ...48 Qty 2 2 2 SMOKE DOME 12 28 2 Size A 32 1 2 43 43 53 True Height When Installed 34 28 2 90 28 6 9 G 5 1 2 Model 28 Only 65 28 3 G Cut to 20 Cut as shown mortar pieces together and stagger joints wh...

Страница 12: ...ze 34 60 4 34 72 4 Backwall Part Fireplace Quantity No Size M67 60 8 M67 72 8 Damper Support Left and Right Part Fireplace Quantity No Size M94L 60 M94L 72 1 1 M94R 60 1 M94R 72 1 43 28 6 1 4 6 1 4 52...

Страница 13: ...above the top of the firebox opening Drywall must be cut 2 back from the firebox opening sides and 8 above the top of the opening Notes A The EPA Phase 2 qualified Standard Series fireplace fireplace...

Страница 14: ...ly mortared firebox and smoke dome assembly requires approximately 25 pounds dry measure of Earthcore mortar Broken Components Components broken into 2 or 3 pieces can be repaired by using Earthcore m...

Страница 15: ...one half inches 1 1 2 above the top of the concrete support slab If the design preference is for a raised hearth floor of the fireplace elevated above the room s floor then the base plate can be set o...

Страница 16: ...firebox for level If necessary adjust the top surface of the box assembly for level by inserting a shim between the lowest wall component and the top surface of the base plate Any gap created under t...

Страница 17: ...e smoke dome sloping sidewalls have a beveled bottom edge so that they will sit tight onto the flat top of the side walls Step 12 Make sure that all component contact surfaces have been properly seale...

Страница 18: ...Assembly Instructions Isokern Magum 86072 Models 18...

Страница 19: ...eat expansion The sleeve passes through the firebox wall and must be connected to metal pipe by other either flexible or rigid that leads to the source for outside combustion air as directly as possib...

Страница 20: ...inished brickwork however this is just a suggestion and other face joint dimensions are also acceptable Step 1 Wet mop the inside of the EPAPhase 2 qualified Standard Series fireplace with a damp spon...

Страница 21: ...3 8 in the brick work is recommended and has the best appearance Other face joint dimensions are acceptable however smaller joints may not leave room for heat expansion of fire brick 3 Start the fire...

Страница 22: ...econd fire should be the same as the first fire The second fire should burn for no more than thirty to sixty minutes and allowed to go out Do not refuel the fireplace during the second lighting A twen...

Страница 23: ...ing season in colder climates thoroughly inspect the Fire Lite fireplace and chimney system Chimneys must be installed so that access is provided for inspection and cleaning The chimney should be insp...

Страница 24: ...ng directions in manufacturers operating manual For warranty purposes proof of fireplace or HearthCAT purchase is required Labor for removal and or re installation of the catalytic component is not th...

Страница 25: ...brief description of the defect ISOKERN or any division thereof is not responsible for any labor costs or indirect costs incurred for the replacement of defective components ISOKERN is not responsibl...

Отзывы: