background image

      © 

2007 

 

Earthcore 

Industries, 

L.L.C.

THIS MANUAL CAN ONLY BE REPRODUCED IN ITS ENTIRETY

Isokern® EPA Phase 2 Qualified Fireplaces

Installation, Operation, Maintenance and Owner’s Manual

Isokern Standard Series, Magnum Series & Magnum 86072 Series

A PRODUCT OF EARTHCORE INDUSTRIES, LLC.

Important: This manual contains assembly rules, installation steps, guidelines, use and maintenance 

instructions for the EPA Phase 2 Qualified Standard Series Fireplace system. This manual must become 

the property of and be reviewed by all current and future users of this product. It is the responsibility of 

the general contractor and the installer of this product to ensure that the instructions in this manual are 

followed exactly and, further that any allowed gas log appliance used in this product be installed in strict 

accordance with NFPA 58, NFPA 54/ANSI Z223.1 and the gas log manufacturer’s explicit installation, sizing 

and operation instructions. It is the responsibility of the general contractor to provide adequate clearances 

from all firebox surfaces as specified in this manual.

INSTALLER: Leave this manual with the appliance

CONSUMER: Retain this manual for future reference

Installation Date______________________________

NOTE: The Catalytic Combustor system should be replaced at a minimum in 3 years, 

maximum of 5 years.

 

Be Sure to Read Entire Manual Before Beginning Construction.

Contents of this manual may change without prior notification.

THIS FIREPLACE IS DESIGNED for USE with

SOLID WOOD LOGS, PLUMBED PROPANE

(LP) or NATURAL GAS (NG), ONLY

WARNING: If the information in this manual is not followed exactly, a fire or explosion may result 

causing property damage, personal injury or loss of life.

SBCCI NO. 9626 

 

 

 

 

 

 

 

 

NYC-MEA 241-90-E

ICC Report NO. ESR-2316   

 

 

 

 

 

      

LA RR NO. 25483

IBC 2006, IRC 2006, IMC 2006 

 

 

 

 

 

 

Issued: February, 2010

 

 

 

 

 

 

 

 

 

 

 

Revision: 003 

Intertek Testing Services Report No. 100244585PRT-006

Omni-Test Laboratories Report No. 257-F-06-3

 

Содержание Isokern Magnum 86072 Series

Страница 1: ...g manufacturer s explicit installation sizing and operation instructions It is the responsibility of the general contractor to provide adequate clearances from all firebox surfaces as specified in thi...

Страница 2: ...List and Dimensions Isokern Standard Series Component List and DImensions Magnum Series Component List and Dimensions Magnum 86072 Series Required Clearance to Combustibles Assembly Instructions Isok...

Страница 3: ...consists of an outer casing block and an inner liner with a fourteen inch 14 diameter flue hole The chimney components are field assembled using Earthcore Mortar to glue the components together The D...

Страница 4: ...s eg burning construction debris or other highly flammable material tossing kicking or otherwise forcing logs into the firebox EPA Phase 2 qualified Standard Series fireplace and DM 54 chimney systems...

Страница 5: ...of air during the normal firing process In the event the home is tightly sealed and has modern energy efficient features the optional combustion air supply kits may not provide all the air required to...

Страница 6: ...Warnock Hersey Listing Label Facsimile 6...

Страница 7: ...n a permit EPA Yellow Phase 2 Qualifying Hangtag 7 MANUFACTURER EARTHCORE INDUSTRIES LLC MODEL NO Series 36 C PARTICLE EMISSIONS 2 93 GRAMS KG OF WOOD BURNED For proper operation catalyst must be repl...

Страница 8: ...4 C 5 2 3 4 G 69 3 4 69 3 4 37 1 4 69 3 4 WEIGHT 1300 lbs 1420 lbs 1600 lbs 3 10 3 4 Catalyst 56 W x 71 H x 29 1 2 D MINIMUM FRAMING 46 W x 71 H x 29 1 2 D 52 W x 71 H x 29 1 2 D C 33 43 33 48 36 42...

Страница 9: ...ually seen coming out of a chimney is essentially a combination of unburned fuel carbon and hydrogen and moisture in the form of water vapor The Catalytic Combustor system is a technology that provide...

Страница 10: ...Model A 36 43 Smoke Dome Small Part No Model Qty No 12 36 2 Smoke Dome Medium Part No Model Qty No 11 46 2 Side Wall Part No Model Qty No 20 36 6 Back Walls Part No Model Qty No 25 36 3 Model A 36 26...

Страница 11: ...48 Qty 2 2 2 SMOKE DOME 12 28 2 Size A 32 1 2 43 43 53 True Height When Installed 34 28 2 90 28 6 9 G 5 1 2 Model 28 Only 65 28 3 G Cut to 20 Cut as shown mortar pieces together and stagger joints wh...

Страница 12: ...ze 34 60 4 34 72 4 Backwall Part Fireplace Quantity No Size M67 60 8 M67 72 8 Damper Support Left and Right Part Fireplace Quantity No Size M94L 60 M94L 72 1 1 M94R 60 1 M94R 72 1 43 28 6 1 4 6 1 4 52...

Страница 13: ...above the top of the firebox opening Drywall must be cut 2 back from the firebox opening sides and 8 above the top of the opening Notes A The EPA Phase 2 qualified Standard Series fireplace fireplace...

Страница 14: ...ly mortared firebox and smoke dome assembly requires approximately 25 pounds dry measure of Earthcore mortar Broken Components Components broken into 2 or 3 pieces can be repaired by using Earthcore m...

Страница 15: ...one half inches 1 1 2 above the top of the concrete support slab If the design preference is for a raised hearth floor of the fireplace elevated above the room s floor then the base plate can be set o...

Страница 16: ...firebox for level If necessary adjust the top surface of the box assembly for level by inserting a shim between the lowest wall component and the top surface of the base plate Any gap created under t...

Страница 17: ...e smoke dome sloping sidewalls have a beveled bottom edge so that they will sit tight onto the flat top of the side walls Step 12 Make sure that all component contact surfaces have been properly seale...

Страница 18: ...Assembly Instructions Isokern Magum 86072 Models 18...

Страница 19: ...eat expansion The sleeve passes through the firebox wall and must be connected to metal pipe by other either flexible or rigid that leads to the source for outside combustion air as directly as possib...

Страница 20: ...inished brickwork however this is just a suggestion and other face joint dimensions are also acceptable Step 1 Wet mop the inside of the EPAPhase 2 qualified Standard Series fireplace with a damp spon...

Страница 21: ...3 8 in the brick work is recommended and has the best appearance Other face joint dimensions are acceptable however smaller joints may not leave room for heat expansion of fire brick 3 Start the fire...

Страница 22: ...econd fire should be the same as the first fire The second fire should burn for no more than thirty to sixty minutes and allowed to go out Do not refuel the fireplace during the second lighting A twen...

Страница 23: ...ing season in colder climates thoroughly inspect the Fire Lite fireplace and chimney system Chimneys must be installed so that access is provided for inspection and cleaning The chimney should be insp...

Страница 24: ...ng directions in manufacturers operating manual For warranty purposes proof of fireplace or HearthCAT purchase is required Labor for removal and or re installation of the catalytic component is not th...

Страница 25: ...brief description of the defect ISOKERN or any division thereof is not responsible for any labor costs or indirect costs incurred for the replacement of defective components ISOKERN is not responsibl...

Отзывы: