- 36 -
7. Maintenance
Weekly Maintenance
(continued)
Check the machine by strapping several bundles for any failures.
Monthly Maintenance
(or after 100,000 strapping cycles)
Clean both sides of the heater plate and polish with fine sandpaper if necessary.
Note: Make sure the welding plate has cooled before performing maintenance.
Check Front Bar, Press Bar, and Rear Bar for moving upward and downward neatly. The Slide Table
and Strap Track Frame should be able to go back to its home position by the force of spring as well.
Be sure to clean any debris in the tension roller.
6-Month Maintenance
(or after 500,000 strapping cycles)
•
Check heating element, replace and re-adjust it if necessary.
•
Check strap cutter in sealing head, replace it if necessary.
•
Check if the connector at the wiring housing to the printed circuit board is firmly fixed.
•
Check if the safety switch on front table or right door functions well.
•
Make machine ready for operation. Strap one bundle manually several times, checking for any
mal-functions. Make sure the strap accumulating function is working properly. If necessary,
replace the assistant rollers. Perform adjustments to accumulating feeding pressure or to the
clearance in the reel brake.
•
Slightly lubricate the sealing head (bearing points) with light lubricant if necessary.
Annual Maintenance
(or after 1,000,000 strapping cycles)
•
Replace deflection roller if it shows visible changes.
•
If bearing are producing significant noise, locate and replace.
Содержание 715RS
Страница 18: ...18...
Страница 24: ...24...
Страница 27: ...27 Brush Clearance...
Страница 33: ...33...
Страница 35: ...35...
Страница 38: ...38 8 Parts List Illustrations...