- 12 -
3. Machine Setup & Installation
3.3 Installation
1.
Remove the packing material and the check that the machine is complete and free of damage.
2.
Install the gas spring
a.
To protect the Gas Spring, the PIN on one side of the Gas Spring would be detached
before shipment and the Reel Group would be also fixed by Cable tie (shown as
following drawing). Before operating the machine, the Gas Spring must be installed well.
b.
Open the Right door of the machine and take out the plastic bag A. Inside this bag, there
are an operation manual and parts as listed in following chart.
c.
Cut the cable tie that secures the reel group.
d.
Have M7-4-101200 Shaft threading from inside of the machine and then lift the Reel
Group and move the Gas Spring to make the PIN also goes through the hole and use 2
Allan Key with 3mm to fix TPW05+SW05 all together.
Part Number
Description
Qty
M7-4-101-200 Shaft
1
THS0508N
THS, M5x8 (N)
2
SW05
SW, M5
2
PW05
PW, M5
Содержание 715RS
Страница 18: ...18...
Страница 24: ...24...
Страница 27: ...27 Brush Clearance...
Страница 33: ...33...
Страница 35: ...35...
Страница 38: ...38 8 Parts List Illustrations...