Step 1
9
1.5
Wooden Deck
or
Concrete Ground
Base Assembly, cont’d
Base
Assembly on Wood
or Concrete Pad
Build a level wood
or concrete pad
that is slightly
wider and longer
than the green
house.
DO NOT
use Part 30 and 31
if set up on
wooden deck or
concrete ground.
1.3
1.4
30
31
27-1
Assembly on
Ground
Excavate the site
by removing the
top 3 in of grass or
soil and leveling
the base, allowing
a 6 in perimeter
around the
foundation.
Содержание GHPC48V2-GRN-AZ
Страница 1: ...EAGLE PEAK PC GREENHOUSE 6 FT x 8 FT x 7 FT Thank you for choosing Eagle Peak INSTRUCTION MANUAL ...
Страница 5: ...207 cm 6 8 ft 58 cm 1 9 ft 2 5 1 c m 8 2 f t 190 cm 6 2 ft 138 cm 4 5 ft Dimensions Specifications 3 ...
Страница 13: ...Step 2 11 2 1 2 4 19B E4 20B 18B 19B 13 2 3 2 1 2 2 2 3 2 2 5 Vent Window Assembly cont d ...
Страница 22: ...Attach the Door cont d 14A 13A 2 1C 1B 5 3 5 4 5 2 5 1 5 5 5 3 Step 5 20 ...
Страница 30: ...Parts required for this step Roof Ridge Beam Assembly 21 1X 2X 5 12X M6 10 19 4X 4 9B 2X 1220 Step 8 28 ...
Страница 35: ...3D 6X 1115 5 33X M6 10 24 9X 4 1X Installing the Roof Rafters Parts required for this step 33 Step 10 ...
Страница 48: ...13 3 13 1 13 2 13 4 13 4 13 4 13 1 13 2 13 3 Installing the Accessories cont d Step 13 46 ...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......