3
1.2
1.3
1.1
27-2
27-2
27-1
27-2
27-2
27-1
30
31
1.1
1.2
1.3
1.2
1.3
1.2
1.3
1.4
1.5
1.4
1.5
31
31
32
251 cm
8.2 ft
190 cm
6.2 ft
28
28
28
28
Base Assembly, cont’d
Assemble the foundation frame using (2) 27-2 Beams, (1) 32 Middle Bracket, and (4) 3 Screws,
Nuts and Washers. Repeat 1X.
Assemble the foundation frame using (2) 27-2 Beam Assembly, (2) 27-1 Beam Assembly, (4) 28
Corner Brackets, (4) 29 Base Hooks, and (16) 3 Screws, Nuts and Washers. Use (4) 30 Corner
Stakes, as shown in Step 1.2. if the greenhouse will be anchored directly to the ground.
Step 1
8
27-2
27-2
32
3
1.1
Corner Stakes
are needed to
set up in soil (Status 1)
28
27-2
30
3
27-2
27-1
28
29
27-1
1.2
1.3
3
Содержание GHPC48V2-GRN-AZ
Страница 1: ...EAGLE PEAK PC GREENHOUSE 6 FT x 8 FT x 7 FT Thank you for choosing Eagle Peak INSTRUCTION MANUAL ...
Страница 5: ...207 cm 6 8 ft 58 cm 1 9 ft 2 5 1 c m 8 2 f t 190 cm 6 2 ft 138 cm 4 5 ft Dimensions Specifications 3 ...
Страница 13: ...Step 2 11 2 1 2 4 19B E4 20B 18B 19B 13 2 3 2 1 2 2 2 3 2 2 5 Vent Window Assembly cont d ...
Страница 22: ...Attach the Door cont d 14A 13A 2 1C 1B 5 3 5 4 5 2 5 1 5 5 5 3 Step 5 20 ...
Страница 30: ...Parts required for this step Roof Ridge Beam Assembly 21 1X 2X 5 12X M6 10 19 4X 4 9B 2X 1220 Step 8 28 ...
Страница 35: ...3D 6X 1115 5 33X M6 10 24 9X 4 1X Installing the Roof Rafters Parts required for this step 33 Step 10 ...
Страница 48: ...13 3 13 1 13 2 13 4 13 4 13 4 13 1 13 2 13 3 Installing the Accessories cont d Step 13 46 ...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......