DESCRIPTION 

 

1-1  PURPOSE  OF  LOAD  BANK:  The  LB-60-70  is  a  portable  load  bank  designed  to  be  used  for  field 
servicing and testing 60HZ generators and UPS systems. It can be used for checking cables after they 
have  been  replaced  or  repaired.  The  load  bank  can  also  be  shipped  to  different  locations  using  the 
carrying case. 

 

1-2  RATING OF LOAD BANK: The LB-60-70 is rated at 70 KW full load with all four load steps turned 
on  and  the  rotary  rate  switch  set  to  5KW.  The  load  steps  are  5KW,  10KW,  20KW  and  30KW  plus  a 
rotary  rate  switch  with  loads  of  1-5KW.  This  gives  a  0-70KW  range  in  1KW  steps.    All  steps  are 
continuous. 

 

1-3  LOAD  BANK  DESCRIPTION:  The  load  bank  is  completely  self-contained  and  needs  no  power 
source to operate other than the power being tested. The different sides of the load bank are shown in 
fig. 1-1. The air enters the right side (fan side) and exits the left side. 

 
 
 

 

 

 

LENGTH 

22 IN. 

WIDTH 

8 IN. 

HEIGHT 

21 IN. 

WEIGH  55 LBS. 

Содержание LB-400-100D

Страница 1: ...gle Eye Power Solutions LLC LB 60 70 LOAD BANK MANUAL CONTAINS OPERATING INSTRUCTIONS PARTS LIST WIRING DIAGRAMS SERVICE INSTRUCTIONS Eagle Eye Power Solutions LLC 4031 W Kiehnau Ave Milwaukee WI 5320...

Страница 2: ...THE POTENTIAL OF DELIVERING A LETHAL SHOCK THIS LOAD BANK SHOULD BE USED ONLY BY TRAINED AND QUALIFIED PERSONNEL THIS LOAD BANK IS DESIGNED FOR TEMPORARY USE ONLY THE LOAD RESISTORS ARE ENERGIZED WHEN...

Страница 3: ...0VAC SINGLE PHASE 2 1 TESTING 240VAC SINGLE PHASE 2 3 TESTING 208VAC THREE PHASE 2 5 PARTS PARTS INFORMATION 3 1 CONTROL PANEL PARTS LAYOUT FIGURE 3 1 3 2 CONTROL PANEL PARTS LIST 3 3 INTERIOR PARTS L...

Страница 4: ...LB 60 70 is rated at 70 KW full load with all four load steps turned on and the rotary rate switch set to 5KW The load steps are 5KW 10KW 20KW and 30KW plus a rotary rate switch with loads of 1 5KW T...

Страница 5: ...Eagle Eye Power Solutions LLC...

Страница 6: ...FREQUENCY METER A 55 65 HZ meter used to measure the frequency of the power unit It should read approximately 60HZ METER SWITCH Switch used to select A B or C phase on the voltmeter RATE SWITCHES Swit...

Страница 7: ...C or less If the voltage is above 120VAC turn off the power being tested and fix the high voltage problem before using the load bank 2 3 CHECKING THE POWER check the following A The amber light A shou...

Страница 8: ...VAC or less If the voltage is above 120VAC turn off the power being tested and fix the high voltage problem before using the load bank 2 3 CHECKING THE POWER check the following A The amber light A an...

Страница 9: ...oltage is above 120VAC turn off the power being tested and fix the high voltage problem before using the load bank 2 3 CHECKING THE POWER check the following A The amber light A B C should beon B The...

Страница 10: ...how a vendor name A part number can be found by first locating the part on a drawing After finding the part use the number to refer to the parts list on the opposite page Each part will have a drawing...

Страница 11: ...Eagle Eye Power Solutions LLC...

Страница 12: ...1 3 MR 60 55 65 HERTZ FREQUENCY METER 1 4 HD 25 HANDLE 2 5 KN 10 POINTER KNOB 2 6 SW 13 ROTARY SWITCH 3 POSITION 1 POLE 1 7 LT 10 115VAC AMBER LIGHT 3 8 SW 31 ROTARY SWITCH 10 POSITION 3 POLE 1 9 SW...

Страница 13: ...Eagle Eye Power Solutions LLC...

Страница 14: ...RESISTOR 100 5W 1 9 CP 22 22UF 150VDC 1 10 RD 10 DIODE 1A 4 11 SW 11 AIR FLOW SWITCH 1 12 LR 08 8 0 RESISTOR 39 13 LR 40 40 RESISTOR 3 14 LR 18 18 8 RESISTOR 6 15 FH 15 SNAP IN FUSE HOLDER 1 16 FS 10...

Страница 15: ...Eagle Eye Power Solutions LLC...

Страница 16: ...3 3 DESCRIPTION NUMBER NUMBER NUMBER VENDOR NO USED 1 FP 57 ALUM FAN PANEL 1 2 TM 20 8 POSITION TERMINAL STRIP V BEAU PRODUCTS 78008 1 3 SW 12 TILT SWITCH 1 4 GL 10 GRILL CHROME 12 5 FN 25 24 VDC FAN...

Страница 17: ...load bank It should however be checked periodically for defective fans burned out light bulbs and defective meters To remove the fan panel remove the screws around the outer edge The meters can be rem...

Страница 18: ...erminal strip coming from the load bank 3 Drill out the rivets holding the fan four on each side 4 Lift up the fan and unplug the wire to the fan Connect the plug to the new fan 5 Rivet the new fan ba...

Страница 19: ...Eagle Eye Power Solutions LLC...

Страница 20: ...Eagle Eye Power Solutions LLC...

Страница 21: ...Eagle Eye Power Solutions LLC...

Страница 22: ...gle Eye Power Solutions LLC Contact EEPS Eagle Eye Power Solutions LLC 4031 W Kiehnau Ave Milwaukee WI 53209 TEL 1 877 805 EEPS 3377 FAX 1 414 962 3660 www eepowersolutions com info eepowersolutions c...

Отзывы: