background image

Eagle Eye Power Solutions, LLC. 

 

 

PARTS INFORMATION 

 

The following pages list the parts used in the load bank. All of the major parts are shown. Wire, screws, bolts, and 
small miscellaneous hardware are not listed. Parts that are purchased from a vendor will show a vendor name. These 
names refer to the vendor list is on page 8. Parts manufactured for or by EEPS will not show a vendor name. 
  
A part number can be found by first locating the part on a drawing. After finding the part use the number to refer to the 
parts list on the opposite page. Each part will have a drawing number, EEPS part number, description and the number 
used for each load bank.  
 

Parts should be ordered from the address below giving the machine model 
number, part number and the description. 

 

Contact EEPS

 

Eagle Eye Power Solutions, LLC.

 

4031 W Kiehnau Ave 

Milwaukee WI, 53209 

 

TEL: 1-877-805 EEPS (3377) FAX: 1-414-962-3660 

www.eepowersolutions.com

 

[email protected]

 

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание LB-400-100D

Страница 1: ...gle Eye Power Solutions LLC LB 60 70 LOAD BANK MANUAL CONTAINS OPERATING INSTRUCTIONS PARTS LIST WIRING DIAGRAMS SERVICE INSTRUCTIONS Eagle Eye Power Solutions LLC 4031 W Kiehnau Ave Milwaukee WI 5320...

Страница 2: ...THE POTENTIAL OF DELIVERING A LETHAL SHOCK THIS LOAD BANK SHOULD BE USED ONLY BY TRAINED AND QUALIFIED PERSONNEL THIS LOAD BANK IS DESIGNED FOR TEMPORARY USE ONLY THE LOAD RESISTORS ARE ENERGIZED WHEN...

Страница 3: ...0VAC SINGLE PHASE 2 1 TESTING 240VAC SINGLE PHASE 2 3 TESTING 208VAC THREE PHASE 2 5 PARTS PARTS INFORMATION 3 1 CONTROL PANEL PARTS LAYOUT FIGURE 3 1 3 2 CONTROL PANEL PARTS LIST 3 3 INTERIOR PARTS L...

Страница 4: ...LB 60 70 is rated at 70 KW full load with all four load steps turned on and the rotary rate switch set to 5KW The load steps are 5KW 10KW 20KW and 30KW plus a rotary rate switch with loads of 1 5KW T...

Страница 5: ...Eagle Eye Power Solutions LLC...

Страница 6: ...FREQUENCY METER A 55 65 HZ meter used to measure the frequency of the power unit It should read approximately 60HZ METER SWITCH Switch used to select A B or C phase on the voltmeter RATE SWITCHES Swit...

Страница 7: ...C or less If the voltage is above 120VAC turn off the power being tested and fix the high voltage problem before using the load bank 2 3 CHECKING THE POWER check the following A The amber light A shou...

Страница 8: ...VAC or less If the voltage is above 120VAC turn off the power being tested and fix the high voltage problem before using the load bank 2 3 CHECKING THE POWER check the following A The amber light A an...

Страница 9: ...oltage is above 120VAC turn off the power being tested and fix the high voltage problem before using the load bank 2 3 CHECKING THE POWER check the following A The amber light A B C should beon B The...

Страница 10: ...how a vendor name A part number can be found by first locating the part on a drawing After finding the part use the number to refer to the parts list on the opposite page Each part will have a drawing...

Страница 11: ...Eagle Eye Power Solutions LLC...

Страница 12: ...1 3 MR 60 55 65 HERTZ FREQUENCY METER 1 4 HD 25 HANDLE 2 5 KN 10 POINTER KNOB 2 6 SW 13 ROTARY SWITCH 3 POSITION 1 POLE 1 7 LT 10 115VAC AMBER LIGHT 3 8 SW 31 ROTARY SWITCH 10 POSITION 3 POLE 1 9 SW...

Страница 13: ...Eagle Eye Power Solutions LLC...

Страница 14: ...RESISTOR 100 5W 1 9 CP 22 22UF 150VDC 1 10 RD 10 DIODE 1A 4 11 SW 11 AIR FLOW SWITCH 1 12 LR 08 8 0 RESISTOR 39 13 LR 40 40 RESISTOR 3 14 LR 18 18 8 RESISTOR 6 15 FH 15 SNAP IN FUSE HOLDER 1 16 FS 10...

Страница 15: ...Eagle Eye Power Solutions LLC...

Страница 16: ...3 3 DESCRIPTION NUMBER NUMBER NUMBER VENDOR NO USED 1 FP 57 ALUM FAN PANEL 1 2 TM 20 8 POSITION TERMINAL STRIP V BEAU PRODUCTS 78008 1 3 SW 12 TILT SWITCH 1 4 GL 10 GRILL CHROME 12 5 FN 25 24 VDC FAN...

Страница 17: ...load bank It should however be checked periodically for defective fans burned out light bulbs and defective meters To remove the fan panel remove the screws around the outer edge The meters can be rem...

Страница 18: ...erminal strip coming from the load bank 3 Drill out the rivets holding the fan four on each side 4 Lift up the fan and unplug the wire to the fan Connect the plug to the new fan 5 Rivet the new fan ba...

Страница 19: ...Eagle Eye Power Solutions LLC...

Страница 20: ...Eagle Eye Power Solutions LLC...

Страница 21: ...Eagle Eye Power Solutions LLC...

Страница 22: ...gle Eye Power Solutions LLC Contact EEPS Eagle Eye Power Solutions LLC 4031 W Kiehnau Ave Milwaukee WI 53209 TEL 1 877 805 EEPS 3377 FAX 1 414 962 3660 www eepowersolutions com info eepowersolutions c...

Отзывы: