Erect both vertical columns (main column with motor mount, used for motor fixing), set
pattern back plate in open middle, make both vertical columns on the same straight line, drill
hole with impact drill hammer of electric hammer pinch ¢20 and fix both vertical columns with
ten M18X160 expansion screws. The vertical column must be vertical to the ground. If the
ground is rough, the filling can be conducted with thin block for regulation. The large gantry
shall be installed in similar way and gantry frame shall be set in open middle of large gantry
respectively so as to keep both vertical columns on the same straight line. The installation
dimension is shown in outline dimensional drawing.
4. Install and connect synchronous steel wire rope and long oil pipe: remove back plate (
gantry
shall be installed in reverse way as shown in steel wire rope installation diagram
), hoist
main column on slide, extended synchronous steel wire rope can insert steel wire rope wheel
at bottom of auxiliary column through steel wire rope at bottom of main column, after it inserts
steel wire rope at the top, fix it at screw hole in square hole of slide with two M16 nuts, hoist
auxiliary column and fixed it on slide of main column with steel wire rope on bracket, block up
slid slightly when steel wire rope is fixed so as to facilitate adjustment and fixture of steel wire
rope screw. Take block away after fixing, inspect whether left slide and right slide at the same
height and adjust it to the same level. Both slides shall be on the same surface. Adjust height
of left slide in same way, loosen steel wire rope and regulate slide height. However, both steel
wire ropes must be tightened, not loose, otherwise, both slides can not be synchronous (
see
steel wire rope installation diagram
). Fill butter on steel wire rope, sliding block and sliding
way of column and fill engine oil on axis and safety.
Connection diagram for steel wire rope of two post floor plate series
Clamp
spring
Oil cylinder
Chain wheel
Chain pin
Cotter
Sprocket shaft Chain
Oiless bearing
Clamp spring
Two post series
Installation diagram for chain
and oil cylinder of lifter