Installation, Operation and Parts Manual
EE-6604 V2.BWF
-
16
Step
7:
Fix
base
frames
with
expansion
bolts.
1.
Drill
anchor
holes
for
expansion
bolts
on
the
ground
with
an
electrical
drill.
Make
sure
to
drill
vertically.
2.
Remove
thoroughly
the
debris
and
dust
in
holes
and
ascertain
that
the
posts
stay
right
upon
the
circle
previously
marked
by
chalk.
3.
Hammer
in
and
secure
expansion
bolts.
Step
8:
Fix
oil
hose
protection
covers.
4.4
Items
to
be
checked
after
installation.
S/N
Check
items
YES
NO
1
Screw
torque
of
expansion
bolts
:
60
‐
80N•m;
2
Rising
speed
≥
20mm/s;
3
Noise
with
rated
load
≤
75db;
4
Grounding
resistance:
not
bigger
than
4
Ω
;
5
Height
difference
of
the
two
platform
≤
5mm;
6
Mechanical
locks
are
robust
and
synchronized
when
running
with
rated
load
;
7
If
the
control
button
works
as
“hold
to
run”?
8
If
limit
switches
work
well?
9
If
grounding
wire
is
connected?
10
If
the
lift
rises
and
lowers
smoothly?
11
If
there
is
no
abnormal
notice
during
running
with
rated
load?
12
If
there
is
no
oil
leakage
when
running
with
rated
load?
13
If
there
is
no
air
leakage
when
running
with
rated
load?
14
If
expansion
bolts,
nuts
or
circlips
are
well
secured?
15
If
max
lifting
height
is
1900mm?
16
If
Safety
advices,
name
plate
and
logos
are
clear?
Содержание EE-6604V2 .BWF
Страница 10: ...Installation Operation and Parts Manual EE 6604 V2 BWF 10 3 3 Dimensions...
Страница 23: ...Installation Operation and Parts Manual EE 6604 V2 BWF 23 2 Recessed Mounting...
Страница 24: ...Installation Operation and Parts Manual EE 6604 V2 BWF 24 Annex 2 Electrical schemes and parts list...
Страница 25: ...Installation Operation and Parts Manual EE 6604 V2 BWF 25...
Страница 26: ...Installation Operation and Parts Manual EE 6604 V2 BWF 26...