E2S GNExB2X05-S Series Скачать руководство пользователя страница 4

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D156-00-621-IS

 

Issue 1

 

27-10-22

 

 

Sheet 4 of 15

 

 

6.2. Access to the Flameproof Enclosure 

 

In order to connect the electrical supply cables to the beacon 
it is necessary to remove the flameproof cover to gain access 
to  the  flameproof  chamber.  To  access  the  Ex  d  chamber, 
loosen  the  M4  grub  screw  on  the  beacon  cover.  Open  the 
enclosure by turning the beacon cover counterclockwise and 
remove  the  cover,  taking  extreme  care  not  to  damage  the 
flameproof threads in the process (see figure 3).   
 

 

Figure 3: Accessing the Explosion Proof Enclosure.

 

 
On completion of the installation the flameproof threaded joint 
should  be  inspected  to  ensure  that  they  are  clean  and  that 
they have not been damaged during installation. 
 
Flameproof threaded joints are not intended to be repaired.  
 
Ensure that the 

‘O’ ri

ng seal is in place and undamaged. 

 
When  fitting  the  flameproof  cover  ensure  the  thread  is 
engaged correctly. Fully tighten the cover all the way, ensure 
no  gap  is visible between  the  cover and  base  of  the  beacon 
enclosure. Tighten the M4 grub screw. 

 

7)  Installation Requirements 

 

7.1.  Installation Standards Compliance 

 

 

Attention: Disconnect from power 
source before installation or service 
to prevent electric shock. 

 
The  beacons  must  only  be  installed  by  suitably  qualified 
personnel in accordance with the latest issues of the relevant 
standards. 
 

ATEX / IECEx & UKEx installation standards 

 

EN60079-14 / IEC60079-14: Explosive atmospheres - 
Electrical installations design, selection and erection. 
 
EN60079-10-1 / IEC60079-10-1: Explosive atmospheres 
- Classification of areas. Explosive gas atmospheres.
 
 
EN60079-10-2 / IEC60079-10-2: Explosive atmospheres 
- Classification of areas. Explosive dust atmospheres.
 
 
The installation of the units must also be in accordance 
with any local codes that may apply and should only be 
carried  out  by  a  competent  electrical  engineer  who  has 
the necessary training. 

NEC / CEC Installation Standards 
 

Cautions 

 

Attention:  Installation  must  be  carried  out  by  an 
electrician  in  compliance  with  the  National  Electrical 
Code, NFPA 70 or CSA 22.1 Canadian Electrical Code, 
Part  I,  Safety  Standard  for  Electrical  Installations, 
Section  32.  /  L'installation  doit  exclusivement  être 
réalisée  par  du  personnel  qualifié,  conformément  au 
code  national  d'électricité  américain,  NFPA  70  ou  CSA 
22.1  Code  canadien  de  l'électricité,  première  partie, 
norme  de  sécurité  relative  aux  installations  électriques, 
Section 32. 

 

Attention:  Disconnect  from  power  source  before 
installation  or  service  to  prevent  electric  shock  / 
Débranchez-le  de  la  source  d'alimentation  avant 
l'installation  ou  l'entretien  pour  éviter  tout  choc 
électrique. 

 
The installation of the units must also be in accordance 
with any local codes that may apply and should only be 
carried  out  by  a  competent  electrical  engineer  who  has 
the necessary training. 

 

7.2. Cable Selection and Connections 
 

When  selecting  the  cable  size,  consideration  must  be  given 
to  the  input  current  that  each  unit  draws  (see  table  1),  the 
number  of  beacons  on  the  line  and  the  length  of  the  cable 
runs.  The  cable  size  selected  must  have  the  necessary 
capacity  to  provide  the  input  current  to  all  of  the  beacons 
connected to the line. 

 

Electrical connections are to be made into the terminal blocks 
on  the  PCBA,  using  solid  wire  0.5-4mm2  /  AWG  20-12  or 
stranded  wire,  sizes  0.5-2.5mm2  /  AWG  24-14.  Wire 
insulation  needs  to  be  stripped  8mm.  Wires  may  be  fitted 
securely with crimped ferrules. 
 

 

Figure 4: Wire Preparation.

 

 
Terminal screws need to be tightened down with a tightening 
torque  of  0.45  Nm  /  5  Lb-in.  A  4-way  terminal  block  is 
provided on the DC Beacon: 2-off +ve and 2-off -ve terminals. 
 
See schematic diagram D191-06-621. 
 
 
 

Содержание GNExB2X05-S Series

Страница 1: ...AND CABLE GLANDS IF TEMPERATURE EXCEEDS AS PER STANDARDS INDICATIONS BELOW FOR ATEX IECEx UKEX STANDARDS 70 C AT ENTRY OR 80 C AT BRANCHING POINT FOR NEC CEC STANDARDS 60 C AT ENTRY OR 60 C AT BRANCHI...

Страница 2: ...in compliance with the National Electric Code CEC Class Zone Ratings Canada Standards CAN CSA C22 2 No 60079 0 Ed 4 02 2019 Explosive Atmospheres Part 0 Equipment General Requirements CAN CSA C22 2 N...

Страница 3: ...mented joints is not permitted Figure 1 Flame Path The enclosure is non conducting and may generate an ignition capable level of electrostatic charges under certain extreme conditions The user should...

Страница 4: ...Explosive dust atmospheres The installation of the units must also be in accordance with any local codes that may apply and should only be carried out by a competent electrical engineer who has the ne...

Страница 5: ...C or the cable branching point temperature may exceed 60 C and therefore suitable heat resisting cables and cable glands must be used with a rated service temperature at least as stated below Table 3...

Страница 6: ...P Switch Location Switch Setting S1 Mode SIL Approved 00 1Hz 60FPM Yes 01 1 33Hz 80FPM No 10 1 5Hz 90FPM No 11 Double Flash No Table 4 Switch Positions for Flash Patterns 9 End of Line Monitoring DC U...

Страница 7: ...l and Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 19 Explos...

Страница 8: ...and Function The SIL 2 Beacon Unit Monitors Standby mode and Active mode Health status of power supply Beacons correct function and flash pattern The SIL 2 beacon operates as part of a SIL 2 system Th...

Страница 9: ...correct the latched fault the alarm horn sounder may require further investigation please contact your local E2S representative Commissioning System Functional start up of System Normally in reverse...

Страница 10: ...hough it is highly recommended that the unit is wired as stated in section 15 1 as a 4 Wire System J1 Header Current Sense Resistor CSR Shown in factory default position A see section 15 3 places TB1...

Страница 11: ...om the circuit Note a cable short circuit will not be detectable in this configuration For one unit only Beacon power supply terminal block Current drawn mA Active Mode 190mA Standby Mode 25mA SIL2 TB...

Страница 12: ...hen no faults and faults occur If multiple SIL 2 alarm horn sounders are to be cabled in series the monitoring connections differ from that of a single beacon For more information see manual D197 00 6...

Страница 13: ...Position B pins 2 3 linked Places power supply terminal Fault Resistor RLY 1 2 in circuit As used in 2 Wire Configuration Figure 16 J2 Header pin positions Fault Resistor FR 15 4 SIL 2 Hard Reset Func...

Страница 14: ...Random Hardware Failures and Architectural constraints route 1H 2 As an unvoted item i e hardware fault tolerance of 0 at SIL 2 The product was assessed against failure modes Failure respond to an in...

Страница 15: ...be specified when ordering The values of resistors available are shown in table 6 below Code Resistor Value Default resistor coding is as follows GNExB2X05DC024AS1S1R A AFZ Example of a custom require...

Страница 16: ...ATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D191 06 621 M ABALOS B ISARD R N POTTS OF NTS 1 1 23 09 2...

Страница 17: ...B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C D...

Страница 18: ...Date and Place of Issue London 03 12 2021 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on t...

Страница 19: ...e Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C Db IP6X Dust P...

Страница 20: ...r Date and Place of Issue London 24 02 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed o...

Отзывы: