E2S D2xS2F Series Скачать руководство пользователя страница 3

 

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D252-00-001-IS

 

Issue 1

 

21-12-2023

 

 

Sheet 3 of 7

 

 

5)  Special Conditions of Safe Use 

 

Special Condition for safe Use as stated on the Type Examination 
Certificate 06ATEX 0421554X / CoC IECEx ULD 14.0012X: 
 
End user shall adhere to the 

manufacturer’s installation and 

instruction when performing housekeeping to avoid the potential for 
hazardous electrostatic charger during cleaning, by using a damp 
cloth. 
 
To maintain the ingress protection rating and mode of protection, the 
cable entries must be fitted with suitably rated, certified cable entry 
and/or blanking devices during installation. 
 
Equipment with the flare horn shall not be installed with the flare 
higher than horizontal (to avoid accumulation of dust). 
 

6)  Product Mounting and Access 

 

6.1 

Mounting 

 
The D2xS2 Alarm Horn may be secured to any flat surface using 
at least two of the three or four 7mm fixing holes. The enclosure 
provides IP66 protection and is suitable for installation in 
exterior locations providing it is positioned so that water cannot 
collect in the horn, and the cable entry is sealed. 

 

14

 5

.7

in

30

  

1.

18

 in

30

  

1.

18

 in

236.9  9.33 in. 

21

9.

 8

.6

in

335.9  13.23 in. 

314.5  12.38 in. 

40

3.

 1

5.

87

 in

465.9  18.34 in. 

55  2.17 in. 

59

  

2.

32

 in

59

  

2.

32

 in

21

 8

.4

in

 

 

 

Fig 1: Mounting Locations 

 

The Equipment must not be installed with the horn facing upwards 
of horizontal. 

 
 
 
 
 
 
 
 
 

 

 

6.2 

Installation procedure

 

  

a. 

Secure the D2xS2 unit to a flat surface via the three 7mm 
fixing holes in the mounting    bracket.  

b.

  

Remove  the  cover  of  the  alarm  horn  by  unscrewing  it, 
taking  care  not  to  damage  the  threads  in  the  process 

(Refer to section 6.3).  

c.

  

Fit an M20/NPT suitably rated cable gland or conduit entry 
into the hole in the enclosure and connect the field wiring 

to the appropriate alarm horn terminals as shown in D252-
06-005  (AC)  or  D252-06-001.  (DC).  The  power  supply 

terminals are duplicated so that units may be connected 

in parallel. An end of line monitoring resistor may be fitted 
to  DC  units  only  (see section  9). If the  second  and  third 

M20/NPT  entries  are  not  used,  suitably  rated  stopping 

plugs must always be fitted. 

d.

  

Replace the cover of the unit, taking care not to damage 
the threads. Tighten fully. 

  
 
 

6.3 

Access to the Enclosure 

  

 

 

Fig 2: Accessing the enclosure

 

  

 

To access the chamber, loosen the M4 grub screw on the sounder 
cover.  Open  the  enclosure  by  turning  the  sounder  cover 
counterclockwise  and  remove the  cover.  Take  extreme  care  not 
to damage the threads in the process. 

  

On completion of the installation the threaded joint should be 
inspected to ensure that they are clean and that they have not been 
damaged during installation.  
 
Ensure the O-ring seal is in place and undamaged. 
 
When fitting the cover ensure the thread is engaged correctly. Fully 
tighten the cover all the way, ensure no gap is visible between the 
cover and base of the sounder enclosure.

 

 

7)  Installation Requirements 

 

7.1 

Safe Installation Requirements 

  

 

Warning 

– High voltage may be 

present, risk of electric shock. 
DO NOT open when energised, 
disconnect power before opening. 

The  sounder  must  only  be  installed  by  suitably  qualified 
personnel in accordance with the latest issues of the relevant 
standards. 

 

The installation of the units must also be in accordance with the 
NEC / CEC and any local regulations and should only be carried 
out  by  a  competent  electrical  engineer  who  has  the  necessary 
training. 

 

7.2  Cable Selection and Connections 

 

Electrical connections are to be made into the terminal blocks on the 
PCBA, using solid wire 0.5-4mm2 / AWG 20-12 or stranded wire, 
sizes 0.5-2.5mm2 / AWG 24-14. Wire insulation needs to be stripped 
8mm. Wires may be fitted securely with crimped ferrules. Terminal 
screws need to be tightened down with a tightening torque of 0.45 
Nm / 3.5 Lb-in. 

 

When selecting the cable size, consideration must be given to the input 
current that each unit draws (see table 1), the number of sounders on 
the line and the length of the cable runs. The cable size selected must 
have  the  necessary  capacity  to  provide  the  input  current  to  all  the 
sounders connected to the line.  

 

 

Solid Wire: 0.5 - 4mm

2

 / AWG20 - AWG12 

Stranded Wire: 0.5 - 2.5mm

2

 / AWG24 - AWG14 

 

Fig 3: Wire Preparation.

 

 

 
When connecting wires to the terminals great care should be taken to 
dress the  wires so that  when  the cover is  inserted  into the  chamber 
the wires do not exert excess pressure on the terminal blocks. This is 
particularly  important  when  using  cables  with  large  cross-sectional 
areas such as 2.5mm². 
 

7.3  Earthing 

D2xS2F 

D2xS2H 

8mm 

Содержание D2xS2F Series

Страница 1: ...above are for the 440Hz Continuous tone nominal input voltage Nominal current at nominal voltage Table 1 Electrical Ratings 2 Warnings DO NOT OPEN WHEN AN EXPLOSIVE ATMOSPHERE IS PRESENT DO NOT OPEN W...

Страница 2: ...ition 7 EN IEC 60079 7 2015 A1 2018 IEC 60079 7 2018 Edition 5 1 EN 60079 31 2014 IEC 60079 31 2022 Edition 3 Model No Rating D2xS2FDC024 D2xS2HDC024 Ex ec IIC T3 Gc Ta 55 C to 75 C Ex ec IIC T4 Gc Ta...

Страница 3: ...ys be fitted d Replace the cover of the unit taking care not to damage the threads Tighten fully 6 3 Access to the Enclosure Fig 2 Accessing the enclosure To access the chamber loosen the M4 grub scre...

Страница 4: ...lands or blanking plugs A minimum ingress protection rating of IP54 must be maintained for installations in explosive gas atmospheres and IP6X must be maintained for installations in explosive dust at...

Страница 5: ...e 1 DIP switch setting Following table Table 3 is a summary of DC D252 06 001 AC D252 06 005 wiring options Config Voltage Configuration Description Features Product Option Identifier 1a DC Single Sta...

Страница 6: ...duct option V when ordering Spare part code for field installation SP78 0001 Figure 10 End of Line Resistor placement Optional 12 Way Terminal Module 10 Maintenance Overhaul and Repair Maintenance rep...

Страница 7: ...with suitably rated cable glands or stopping plugs EOL Monitoring DC Only End of Line Devices may be fitted between the ve ve terminals of the PCBA Please ensure that the device legs meet the wire si...

Страница 8: ...4V D2xS2HDC024 A is approved for use as an audible signal appliance for fire alarm use Public Mode UL464 CAN ULC S525 and produces a minimum sound pressure level of P2 US 95 51dB A CA 103 8dB A P3 US...

Страница 9: ...1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1 0 1 0...

Страница 10: ...MONITORING RESISTOR CUSTOMER SUPPLIED 24V MAX SYSTEM 3K9 MIN 0 5W MIN OR 1K MIN 2 0W MIN 48V MAX SYSTEM 15K MIN 0 5W MIN OR 3K9 MIN 2 0W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT...

Страница 11: ...e OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED RECOMMENDED MINIMUM VALUES...

Страница 12: ...to Stage 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage 2 C...

Страница 13: ...2 A B D252 06 005 R S RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2...

Страница 14: ...urance Notification Conformity to EU type based on quality assurance of the production process Module D Sira Certification Service Notified Body No 2813 CSA Group Netherlands B V Utrechtseweg 310 6812...

Страница 15: ...the components contained within it are free from substances of very high concern Other Standards and Regulations EN 60529 1992 A2 2013 Degrees of protection provided by enclosures IP code enclosure r...

Страница 16: ...Assurance Notification Conformity to EU type based on quality assurance of the production process Module D Sira Certification Service Notified Body No 0518 Rake Lane Eccleston Chester CH4 9JN UK Quali...

Страница 17: ...e components contained within it are free from substances of very high concern Other Standards and Regulations EN 60529 1992 A2 2013 Degrees of protection provided by enclosures IP code enclosure rate...

Страница 18: ...Page left Intentionally blank...

Страница 19: ...Page left Intentionally blank...

Страница 20: ...Page left Intentionally blank...

Отзывы: