way,  the  sum  of  the  2-off  wires  must  be  a  maximum  cross 
sectional area of 2.5mm². Strip wires to 8mm. Wires may also 
be fitted using ferrules. Terminal screws need to be tightened 
down  with  a  tightening  torque  of  0.45  Nm  /  5  Lb-in.  When 
connecting wires to the terminals great care should be taken 
to dress the wires so that when the cover is inserted into the 
chamber  the  wires  do  not  exert  excess  pressure  on  the 
terminal  blocks.  This  is  particularly  important  when  using 
cables with large cross sectional areas such as 2.5mm². 
 

12) AC Wiring 

 

Four connections must be made to the BExCTS110-05D AC 
unit.  A  power  supply  input  cable  should  enter  the  enclosure 
via  one  of  the  M20  entries  and  a  telephone  signal  cable 
should enter through the other M20 entry.  
Connect  the  power  input  (L)  to  the  telephone  board  (L/+) 
terminal  in  the  sounder  section  &  power  input  (N)  to  the 
beacon board (N) terminal in the beacon section.  
Connect the telephone signal input to (TB1) on the telephone 
board in the sounder section. See Figure 4 

 

12.1 

Wiring Diagram 

 

Fig 4 BExCTS110-05D AC Wiring Diagram 

 
 
 

 

 

 

 

Fig. 5a Sounder AC Terminals 

 
 

 

 

Fig. 5b Beacon AC Terminals 

 

13) DC Wiring 

 

Four connections must be made to the BExCTS110-05D DC 
unit.  A  power  supply  input  cable  should  enter  the  enclosure 
via  one  of  the  M20  entries  and  a  telephone  signal  cable 
should enter through the other M20 entry.  
Connect  the  power  input  (+)  to  the  telephone  board  (L/+) 
terminal  in  the  sounder  section  &  power  input  (-)  to  the 
beacon board (-) terminal in the beacon section.  
Connect the telephone signal input to (TB1) on the telephone 
board in the sounder section. See Figure 5 

 

13.1 

Wiring Diagrams 

 

Fig 6 BExCTS110-05D DC Wiring Diagram

 

 

 

 

 

 

DIP Switch 

Volume Control 

Stage 

Terminals 

AC 

Terminals 

S2 

 

S3 

 

 

N  

 

 

 

N  

 

Interconnecting Terminals 
to sounder PCB 
(simultaneous 
mode of operation) 

TB1 Telephone 
Signal 
Input Terminals 

TB3 Sounder 
Mains Supply  
Output L 

Telephone Setting DIP Switch 

TB2 Beacon 
Mains Supply  
Output L 
LLTerminals 
L and N 

Содержание BExCTS110-05

Страница 1: ...C Db Ta 50 C to 55 C Ex tb IIIC T125 C Db Ta 50 C to 70 C Certificate No KEMA 01ATEX2223X IECEx KEM 10 0025X The units can be installed in locations with the following conditions Area Classification...

Страница 2: ...he combined sounder beacon should be made with due regard to the area over which the warning signal must be visible They should only be fixed to services that can carry the weight of the unit The BEx...

Страница 3: ...lanking devices during installation according to EN IEC60079 14 If a high IP Ingress Protection rating is required then a suitable sealing washer must be fitted under the cable glands or blanking plug...

Страница 4: ...le should enter through the other M20 entry Connect the power input L to the telephone board L terminal in the sounder section power input N to the beacon board N terminal in the beacon section Connec...

Страница 5: ...seven shows the switch positions 1 4 for the country setting and switch 5 for the beacon continuous or pulse mode and switch 6 for the sounder continuous or pulse mode When making any changes to the...

Страница 6: ...n in figure 11 Fig 11 Cover and Guard Fixtures 16 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance...

Страница 7: ...lephone Selection Settings DIP Switch Settings DIP Switch Settings Dialing Country Setting 1 2 3 4 5 6 Australia Ireland New Zealand Singapore South Africa UK 0 0 0 0 Belgium Canada Cyprus Hong Kong S...

Страница 8: ...1 0 Tone 31 Tone 1 12 Alternating 800 1000Hz at 0 875Hz 1 1 0 1 0 Tone 4 Tone 5 13 Intermittent 2400Hz at 1Hz 0 0 1 1 0 Tone 15 Tone 5 14 Intermittent 800Hz 0 25s on 1s off 1 0 1 1 0 Tone 4 Tone 5 15...

Отзывы: