E2S BExCTS110-05 Скачать руководство пользователя страница 2

_______________________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           [email protected]              Tel: +44 (0)208 743 8880 

                                                                                                                                                             www.e-2-s.com             Fax: +44 (0)208 740 4200 
Document No. D210-00-681-IS           Issue 3          20-04-2020                         Sheet 2 of 8                                                                                            

 

3)  Type Approval Standards

 

 

The  combined  sounder  beacon  carries  an  EC  Type 
Examination  Certificate  and  IECEx  Certificate  of  Conformity, 
and  have  been  certified  to  comply  with  the  following 
standards: 

 

EN60079-0:2012 + A11 and EN IEC 60079-0 :2018 / 
IEC60079-0:2017 (Ed 7): Explosive Atmospheres - 
Equipment. General requirements 
 
EN60079-1:2014 / IEC60079-1:2014 (Ed 7): Explosive 
Atmospheres - Equipment protection by flameproof 
enclosures "d" 

 

EN 60079-31:2014 / IEC60079-31:2013 (Ed 2):  
Explosive Atmospheres - Equipment dust ignition protection 
by enclosure "t" 

 

4)  Installation Requirements

 

 

The  combined  sounder  beacon  must  only  be  installed  by 
suitably  qualified  personnel  in  accordance  with  the  latest 
issues of the relevant standards: 

 

EN60079-14 / IEC60079-14: Explosive atmospheres - 
Electrical installations design, selection and erection 

 

EN60079-10-1 / IEC60079-10-1: Explosive atmospheres - 
Classification of areas. Explosive gas atmospheres 

 

EN60079-10-2 / IEC60079-10-2: Explosive atmospheres 

–  

Classification of areas. Explosive dust atmospheres 

 

The  installation  of  the  combined  sounder  beacon  must  also 
be  in  accordance  with  any  local  codes  that  may  apply  and 
should only be carried out by a competent electrical engineer 
who has the necessary training. 

 

5)  Special Conditions of Use 

 

Repair of the flamepath / flameproof joints is not permitted. 

 

The  enclosure  is  non-conducting  and  may  generate  an 
ignition-capable  level  of  electrostatic  charges  under  certain 
extreme conditions (such as high-pressure  steam). The user 
should ensure that the equipment is not installed in a location 
where  it  may  be  subjected  to  external  conditions  that  might 
cause  a  build-up  of  electrostatic  charges  on  non-conducting 
surfaces. 

 

Additionally,  cleaning  of  the  equipment  should  be  done  only 
with a damp cloth

 

6)  Location and Mounting

 

 

The  location  of  the  combined  sounder  beacon  should  be 
made  with  due  regard  to  the  area  over  which  the  warning 
signal must be visible. They should only be fixed to services 
that can carry the weight of the unit. 

 

The  BEx  combined  sounder  beacon  should  be  secured  to 
any  flat  surface  using  at  least  two  of  the  three  7mm  fixing 
holes on the stainless steel U shaped mounting bracket. See 
Figure  1.  The  required  angle  can  be  achieved  by  loosening 
the  two  large  bracket  screws  in  the  side  of  the  unit,  which 
allow adjustment of the combined sounder beacon in steps of 
18°.  On  completion  of  the installation  then  two  large  bracket 

adjustment  screws  on  the  side  of  the  unit  must  be  fully 
tightened to ensure that the unit cannot move in service. 

 

Fig. 1a Fixing Location for Combined Flare 

 

Fig. 1b Fixing Location for Combined Radial 

 

7)  Access to the Flameproof Enclosure

 

 

 

 

To  access  the  Ex  d  chamber,  remove  the  four  M6  hexagon 
socket head screws and withdraw the flameproof cover taking 
extreme  care  not  to  damage  the  flameproof  joints  in  the 
process.  M6  cover  screws  are  Class  A4-80  stainless  steel 
and  only  screws  of  this  category  can  be  used  for  the 
enclosure. 

 

Fig. 2 Accessing the Explosion proof Enclosure. 

 

On completion of the installation, the flameproof joints should 
be inspected to ensure that they are clean and that they have 
not been damaged during installation. 

 

Check that  the  earth  bonding  wire between  the  two castings 
is secure and the ‘O’ ring seal is in place. When replacing the 
flameproof  cover,  casting  ensure  that  it  is  square  with  the 
flameproof  chamber  casting  before  inserting.  Ensure  correct 
orientation  of  Beacon  Housing  onto  Sounder  housing  when 
closing  unit.  Please  note  that  due  to  the  tight  spacing 
internally  the  Beacon  housing  can  only  be  closed  in  one 
orientation  relative  to  the  Sounder  housing,  otherwise  PCB 
boards may become damaged. 
The M20 entries on the Beacon housing must be aligned with 
the  product  labels  on  the  side  of  the  Sounder  housing  (both 

Warning 

 

Hot surfaces. External surfaces 

and internal components may be hot after 
operation, take care when handling the 
equipment. 

Warning 

– High voltage may be present, 

risk of electric shock. DO NOT open when 
energised, disconnect power before 
opening. 

(Appropriate cable 
glands to be 
customer supplied)  

Flameproof 

cover 

M6 
Cover 
Screws 

M6 Spring 
Washer 

Beacon 
Section 

Sounder 

Section 

Содержание BExCTS110-05

Страница 1: ...C Db Ta 50 C to 55 C Ex tb IIIC T125 C Db Ta 50 C to 70 C Certificate No KEMA 01ATEX2223X IECEx KEM 10 0025X The units can be installed in locations with the following conditions Area Classification...

Страница 2: ...he combined sounder beacon should be made with due regard to the area over which the warning signal must be visible They should only be fixed to services that can carry the weight of the unit The BEx...

Страница 3: ...lanking devices during installation according to EN IEC60079 14 If a high IP Ingress Protection rating is required then a suitable sealing washer must be fitted under the cable glands or blanking plug...

Страница 4: ...le should enter through the other M20 entry Connect the power input L to the telephone board L terminal in the sounder section power input N to the beacon board N terminal in the beacon section Connec...

Страница 5: ...seven shows the switch positions 1 4 for the country setting and switch 5 for the beacon continuous or pulse mode and switch 6 for the sounder continuous or pulse mode When making any changes to the...

Страница 6: ...n in figure 11 Fig 11 Cover and Guard Fixtures 16 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance...

Страница 7: ...lephone Selection Settings DIP Switch Settings DIP Switch Settings Dialing Country Setting 1 2 3 4 5 6 Australia Ireland New Zealand Singapore South Africa UK 0 0 0 0 Belgium Canada Cyprus Hong Kong S...

Страница 8: ...1 0 Tone 31 Tone 1 12 Alternating 800 1000Hz at 0 875Hz 1 1 0 1 0 Tone 4 Tone 5 13 Intermittent 2400Hz at 1Hz 0 0 1 1 0 Tone 15 Tone 5 14 Intermittent 800Hz 0 25s on 1s off 1 0 1 1 0 Tone 4 Tone 5 15...

Отзывы: