background image

_______________________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           [email protected]              Tel: +44 (0)208 743 8880 

                                                                                                                                                             www.e-2-s.com             Fax: +44 (0)208 740 4200 
Document No. D201-00-601-IS           Issue 2          24-08-16                         Sheet 2 of 8                                                                                            

 

3)  Type Approval Standards

 

 

The combined sounder beacon carries an EC Type 
Examination Certificate and IECEx Certificate of Conformity, 
and have been certified to comply with the following 
standards: 

 

EN60079-0:2012+A11:2013 / IEC60079-0:2011 (Ed 6):  
Explosive Atmospheres - Equipment. General requirements 

 

EN60079-1:2007 / IEC60079-1:2007 (Ed 6):  
Explosive Atmospheres - Equipment protection by flameproof 
enclosures "d" 

 

EN 60079-31:2014 / IEC60079-31:2013 (Ed 2):  
Explosive Atmospheres - Equipment dust ignition protection 
by enclosure "t" 

 

4) Installation 

Requirements

 

 

The combined sounder beacon must only be installed by 
suitably qualified personnel in accordance with the latest 
issues of the relevant standards: 

 

EN60079-14 / IEC60079-14: Explosive atmospheres - 
Electrical installations design, selection and erection 

 

EN60079-10-1 / IEC60079-10-1: Explosive atmospheres - 
Classification of areas. Explosive gas atmospheres 

 

EN60079-10-2 / IEC60079-10-2: Explosive atmospheres –  
Classification of areas. Explosive dust atmospheres 

 

The installation of the combined sounder beacon must also 
be in accordance with any local codes that may apply and 
should only be carried out by a competent electrical engineer 
who has the necessary training. 

 

5)  Special Conditions of Use 

 

Repair of the flamepath / flameproof joints is not permitted. 

 

The enclosure is non-conducting and may generate an 
ignition-capable level of electrostatic charges under certain 
extreme conditions (such as high-pressure steam). The user 
should ensure that the equipment is not installed in a location 
where it may be subjected to external conditions that might 
cause a build-up of electrostatic charges on non-conducting 
surfaces. 

 

Additionally, cleaning of the equipment should be done only 
with a damp cloth

 

6)  Location and Mounting

 

 

The location of the combined sounder beacon should be 
made with due regard to the area over which the warning 
signal must be visible. They should only be fixed to services 
that can carry the weight of the unit. 

 

The BEx combined sounder beacon should be secured to 
any flat surface using the three 7mm fixing holes on the 
stainless steel U shaped mounting bracket. See Figure 1. 
The required angle can be achieved by loosening the two 
large bracket screws in the side of the unit, which allow 
adjustment of the combined sounder beacon in steps of 18°. 
On completion of the installation then two large bracket 
adjustment screws on the side of the unit must be fully 
tightened to ensure that the unit cannot move in service. 

 

Fig. 1 Fixing Location for Combined Flare 

 

Fig. 1 Fixing Location for Combined Radial 

 

7)  Access to the Flameproof Enclosure

 

 

 

 

To access the Ex d chamber, remove the four M6 hexagon 
socket head screws and withdraw the flameproof cover taking 
extreme care not to damage the flameproof joints in the 
process. M6 cover screws are Class A4-80 stainless steel 
and only screws of this category can be used for the 
enclosure. 

 

Fig. 2 Accessing the Explosion proof Enclosure. 

 

On completion of the installation, the flameproof joints should 
be inspected to ensure that they are clean and that they have 
not been damaged during installation. 

 

Check that the earth bonding wire between the two castings 
is secure and the ‘O’ ring seal is in place. When replacing the 
flameproof cover casting ensure that it is square with the 
flameproof chamber casting before inserting. Carefully push 
the cover in place allowing time for the air to be expelled. 
Only after the cover is fully in place should the four M6 
Stainless Steel A4-80 cover bolts and their spring washer be 
inserted and tightened down. If the cover jams while it is 
being inserted, carefully remove it and try again. Never use 
the cover bolts to force the cover into position. 

 
 
 
 

Warning – Hot surfaces. External surfaces 
and internal components may be hot after 
operation, take care when handling the 
equipment. 

Warning – High voltage may be present, 
risk of electric shock. DO NOT open when 
energised, disconnect power before 
opening. 

(Appropriate cable 
glands to be 
customer supplied) 

Flameproof 

cover 

M6 
Cover 
Screws 

M6 Spring 
Washer 

Beacon 
Section

Sounder 

Section

Содержание BExCS110-05D-PAC230

Страница 1: ...Ta 50 C to 70 C Certificate No KEMA 01ATEX2223X IECEx KEM 10 0025X The units can be installed in locations with the following conditions Area Classification Gas Zone 1 Explosive gas air mixture likely to occur in normal operation Zone 2 Explosive gas atmosphere not likely to occur in normal operation but may be present for short periods Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC ...

Страница 2: ...ocation of the combined sounder beacon should be made with due regard to the area over which the warning signal must be visible They should only be fixed to services that can carry the weight of the unit The BEx combined sounder beacon should be secured to any flat surface using the three 7mm fixing holes on the stainless steel U shaped mounting bracket See Figure 1 The required angle can be achie...

Страница 3: ...er beacon range can be supplied with the following types of adapters M20 to NPT M20 to NPT M20 to M25 It is important to note that stopping plugs cannot be fitted onto adapters only directly onto the M20 entries Any other adapters used must be suitably rated and ATEX IECEx certified adapters 10 Earthing Both AC and DC combined sounder beacon units must be connected to an earth The units are provid...

Страница 4: ...12 1 Wiring Diagrams Fig 3a BExCS110 05D AC Simplified Block Diagram for simultaneous operation Fig 3b BExCS110 05D AC Simplified Block Diagram for independent operation 12 2 Sounder Stage Switching 12 2 1 Units First Stage Tones Stage one S1 Operation Simply connect the supply voltage to the L and N supply terminals see fig 4 12 2 2 AC Units Second and Third Stage Tone Selection To select the sec...

Страница 5: ...the S3 terminal Dip switch alters stage 3 tone For units set up for ve switching refer to 13 3 Stage two S2 Operation Power ve and ve link a ve supply line to the S2 terminal Dip switch alters stage 2 tone Stage three S3 Operation Power ve and ve link a ve supply line to the S3 terminal Dip switch alters stage 3 tone Fig 6a DC Terminals Fig 6b Beacon DC Terminals 13 3 Stage Switching Polarity DC U...

Страница 6: ...unit should be used to link the supply from the interconnecting terminals on the beacon board down to the supply terminals on the sounder board 15 Settings 15 1 Tone Selection The sounders have 32 different tones that can be selected for the first stage alarm The sounders can then be switched to sound second and third stage alarm tones The tones are selected by operation of a DIP switch on the pcb...

Страница 7: ...3 Cover and Guard Fixtures 17 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and maintenance...

Страница 8: ... 1 0 Tone 31 Tone 1 12 Alternating 800 1000Hz at 0 875Hz 1 1 0 1 0 Tone 4 Tone 5 13 Intermittent 2400Hz at 1Hz 0 0 1 1 0 Tone 15 Tone 5 14 Intermittent 800Hz 0 25s on 1s off 1 0 1 1 0 Tone 4 Tone 5 15 Continuous at 800Hz 0 1 1 1 0 Tone 2 Tone 5 16 Intermittent 660Hz 150mS on 150mS off 1 1 1 1 0 Tone 18 Tone 5 17 Alternating 544Hz 100mS 440Hz 400mS 0 0 0 0 1 Tone 2 Tone 27 18 Intermittent 660Hz 1 8...

Отзывы: