E2S BExCS110-05D-PAC230 Скачать руководство пользователя страница 6

_______________________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           [email protected]              Tel: +44 (0)208 743 8880 

                                                                                                                                                             www.e-2-s.com             Fax: +44 (0)208 740 4200 
Document No. D201-00-601-IS           Issue 2          24-08-16                         Sheet 6 of 8                                                                                            

 

13.4 Line 

Monitoring 

 

On BExCS110-05D DC units, dc reverse line monitoring can 
be used if required. All DC sounders have a blocking diode 
fitted in their supply input lines. An end of line monitoring 
diode or an end of line monitoring resistor can be connected 
across the +ve and –ve terminals. If an end of line resistor is 
used it must have a minimum resistance value of 3k3

 and a 

minimum power rating of 0.5 watts or a minimum resistance 
value of 500

 and a minimum power rating of 2 watts. 

 
The resistor must be connected directly across the +ve and -
ve terminals as shown in the following drawing. The resistor 
leads should be kept as short as possible.  

 

Fig. 8 End of Line Resistor Placement 

 

14) Wiring the combined sounder/beacon for 

simultaneous operation  

 

The sounder and beacon sections can be wired to the same 
input supply so that they operate simultaneously or they can 
be wired to separate input supplies so they can be operated 
independently (see fig. 3, 5 & 6). 

 

 

If the sounder and beacon sections are connected to the 
same input supply. The incoming cables should be connected 
to the input terminals on the beacon board and the two link 
wires, that are supplied with the unit, should be used to link 
the supply from the interconnecting terminals on the beacon 
board down to the supply terminals on the sounder board. 

 
 
 

15) Settings 

 

15.1 Tone 

Selection

 

 

The sounders have 32 different tones that can be selected for 
the first stage alarm. The sounders can then be switched to 
sound second and third stage alarm tones. The tones are 
selected by operation of a DIP switch on the pcb for both DC 
and AC units. The tone table on page seven shows the 
switch positions for the 32 tones and which tones are 
available for the second and third stages. To operate the 
sounder on stage one simply connect the supply voltage to 
the normal supply terminals (+ve and –ve for DC units,  L and 
N for AC units). 

 
 
 
 

15.2 Volume 

Control 

 

 

The output level of the BEx sounder can be set by adjusting 
the volume control potentiometer (see Fig 9) with the 
exception of 12V DC units. For maximum output, set the 
potentiometer fully clockwise. 
 

 

BExCS110-05D AC 

 

 

BExCS110-05D DC 

Fig. 9 Location of Volume Control Potentiometer   

 

15.3 Flip/Flop 

Operation 

 

Two units can be mounted close to each other to form a flip-
flop operation, where the beacons will flash alternately. To 
achieve this mode of operation, fit a pin header to the flip- 
flop header pins on the electronics board, i.e. the two header 
pins are shorted together, on one of the two beacons. The 
first flash on the beacon that has the header fitted will be 
delayed by ½ second. The two beacons will then flash 
alternately every ½ a second. 

 

Warning - High noise levels above 85dB(A) 
during operation. High levels of noise may 
cause hearing loss, wear suitable ear 
protection when equipment is in operation.

 

End of Line Resistor

Volume Control 
Potentiometer   

Volume Control 
Potentiometer   

Содержание BExCS110-05D-PAC230

Страница 1: ...Ta 50 C to 70 C Certificate No KEMA 01ATEX2223X IECEx KEM 10 0025X The units can be installed in locations with the following conditions Area Classification Gas Zone 1 Explosive gas air mixture likely to occur in normal operation Zone 2 Explosive gas atmosphere not likely to occur in normal operation but may be present for short periods Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC ...

Страница 2: ...ocation of the combined sounder beacon should be made with due regard to the area over which the warning signal must be visible They should only be fixed to services that can carry the weight of the unit The BEx combined sounder beacon should be secured to any flat surface using the three 7mm fixing holes on the stainless steel U shaped mounting bracket See Figure 1 The required angle can be achie...

Страница 3: ...er beacon range can be supplied with the following types of adapters M20 to NPT M20 to NPT M20 to M25 It is important to note that stopping plugs cannot be fitted onto adapters only directly onto the M20 entries Any other adapters used must be suitably rated and ATEX IECEx certified adapters 10 Earthing Both AC and DC combined sounder beacon units must be connected to an earth The units are provid...

Страница 4: ...12 1 Wiring Diagrams Fig 3a BExCS110 05D AC Simplified Block Diagram for simultaneous operation Fig 3b BExCS110 05D AC Simplified Block Diagram for independent operation 12 2 Sounder Stage Switching 12 2 1 Units First Stage Tones Stage one S1 Operation Simply connect the supply voltage to the L and N supply terminals see fig 4 12 2 2 AC Units Second and Third Stage Tone Selection To select the sec...

Страница 5: ...the S3 terminal Dip switch alters stage 3 tone For units set up for ve switching refer to 13 3 Stage two S2 Operation Power ve and ve link a ve supply line to the S2 terminal Dip switch alters stage 2 tone Stage three S3 Operation Power ve and ve link a ve supply line to the S3 terminal Dip switch alters stage 3 tone Fig 6a DC Terminals Fig 6b Beacon DC Terminals 13 3 Stage Switching Polarity DC U...

Страница 6: ...unit should be used to link the supply from the interconnecting terminals on the beacon board down to the supply terminals on the sounder board 15 Settings 15 1 Tone Selection The sounders have 32 different tones that can be selected for the first stage alarm The sounders can then be switched to sound second and third stage alarm tones The tones are selected by operation of a DIP switch on the pcb...

Страница 7: ...3 Cover and Guard Fixtures 17 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and maintenance...

Страница 8: ... 1 0 Tone 31 Tone 1 12 Alternating 800 1000Hz at 0 875Hz 1 1 0 1 0 Tone 4 Tone 5 13 Intermittent 2400Hz at 1Hz 0 0 1 1 0 Tone 15 Tone 5 14 Intermittent 800Hz 0 25s on 1s off 1 0 1 1 0 Tone 4 Tone 5 15 Continuous at 800Hz 0 1 1 1 0 Tone 2 Tone 5 16 Intermittent 660Hz 150mS on 150mS off 1 1 1 1 0 Tone 18 Tone 5 17 Alternating 544Hz 100mS 440Hz 400mS 0 0 0 0 1 Tone 2 Tone 27 18 Intermittent 660Hz 1 8...

Отзывы: