![E-Tech S06-HAE Скачать руководство пользователя страница 86](http://html1.mh-extra.com/html/e-tech/s06-hae/s06-hae_operators-manual-with-maintenance-information_3170838086.webp)
OPERATOR’S MANUAL
with Maintenance Information
Maintenance
81
B-9
Test the Drive Speed - Raised
Position
DINGLI requires that this procedure be
performed every 250 hours or quarterly,
whichever comes first.
Proper drive functions are essential to safe
machine operation. The drive function should
respond quickly and smoothly to operator
control. Drive performance should also be free
of hesitation, jerking and unusual noise over
the entire proportionally controlled speed
range.
Perform this procedure with the machine on a
firm, level surface that is free of obstructions.
1 Create start and finish lines by marking
two lines on the ground 12.2 m apart.
2 Turn the key switch to platform control.
Pull out the platform and ground red
Emergency Stop button to the on position.
3 Press the lift function select button.
4 Press and hold the function enable switch
on the joystick.
5 Raise the platform approximately 2 m from
the ground.
6 Press the drive function select button.
7 Choose a point on the machine; i.e.,
contact patch of a tire, as a visual
reference for use when crossing the start
and finish lines.
8 Bring the machine to top drive speed
before reaching the start line. Begin timing
when your reference point on the machine
crosses the start line.
9 Continue at full speed and note the time
when your reference point on the machine
passes over the finish line. Refer to
specifications.
B-10
Test the Slow Drive Speed
DINGLI requires that this procedure be
performed every 250 hours or quarterly,
whichever comes first.
Proper drive functions are essential to safe
machine operation. The drive function should
respond quickly and smoothly to operator
control. Drive performance should also be free
of hesitation, jerking and unusual noise over
the entire proportionally controlled speed
range.
Perform this procedure with the machine on a
firm, level surface that is free of obstructions.
1 Create start and finish lines by marking
two lines on the ground 12.2 m apart.
2 Turn the key switch to platform control.
Pull out the platform and ground red
Emergency Stop button to the on position.
3 Lower the platform to the stowed position.
4 Press the slow speed select button.
5 Choose a point on the machine; i.e.,
contact patch of a tire, as a visual
reference for use when crossing the start
and finish lines.
6 Bring the machine to top drive speed
before reaching the start line. Begin timing
when your reference point on the machine
crosses the start line.
7 Continue at full speed and note the time
when your reference point on the machine
passes over the finish line. The time is less
than 25 sec.
Содержание S06-HAE
Страница 3: ......
Страница 5: ......
Страница 18: ...OPERATOR S MANUAL with Maintenance Information Decals 13 S06 HAE ACE...
Страница 22: ...OPERATOR S MANUAL with Maintenance Information Decals 17 S0608 HAE ACE S1412 HAE ACE...
Страница 23: ...OPERATOR S MANUAL with Maintenance Information Decals 18...
Страница 110: ...OPERATOR S MANUAL with Maintenance Information Schematic 105 Inspection and Repair Log Date Comments...