14. The installation of the elevator linkage follows
the same procedure as the aileron linkage. The
only difference is you will be using the medium
8
1
/
2
" (215mm) length carbon pushrod linkage
during assembly.
15. The last linkage to install is for operating
the rudder. The long 9
7
/
8
" (250mm) carbon
pushrod is used for the rudder.
32