![E.C.A. Proteus Premix PPR 14 HCH Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/e-c-a/proteus-premix-ppr-14-hch/proteus-premix-ppr-14-hch_installation-and-users-operating-instructions_519144027.webp)
• If device will not be operated for a while in places where there is risk of freezing, then it is necessary to drain
the water or to use an anti-freeze agent.
12 – GAS CONVERSION
Gas conversion operation from LPG to natural gas or from natural gas to LPG should be
performed by authorized service. If the user requests gas transformation after purchase
of the device, it is subject to a fee.
For the gas conversion process, a conversion kit is required. The conversion kit includes 1 gas orifice, 1 klingerite
gasket and 1 gas conversion label. Procedure for gas conversion;
•
Installation of parts in the conversion kit
•
Gas adjustment
•
Parameter change (P01: 0 for natural gas, P01:1 for LPG)
13- ERROR CODES VE DESCRIPTIONS
27
Содержание Proteus Premix PPR 14 HCH
Страница 9: ...5 4 Technical Specifications 9 ...
Страница 10: ...10 ...
Страница 11: ...5 5 Electrical Drawing Figure 4 Boiler sensor in HST model Except of HCH Model Only HM Model 11 ...
Страница 28: ...28 ...
Страница 29: ...Table 4 29 ...
Страница 32: ...16 INSTALLATION TEMPLATE 16 1 HM Model 32 ...
Страница 33: ...E E L C 160 mm 00 160 mm cJiD E E o o L C E 16 2 HCH Model 33 ...
Страница 34: ...E E L C 160 mm 00 C 160 mm E E o o L C E 16 2 HST Model 34 ...
Страница 36: ...36 ...
Страница 37: ...37 ...
Страница 38: ...38 ...
Страница 39: ...39 ...
Страница 41: ...41 ...