1-INTRODUCTION
First of all, we would like to thank you for choosing E.C.A brand. E.C.A.
Confeo Premix
condensing boilers
have been designed to meet for an efficient, safe and comfortable central heating and hot water
requirement.
MT
Model (Boiler) :
Both Central Heating (CH) and Domestic Hot Water (DHW).
CH Model (Heat Only) :
Only for Central Heating (CH).
ST Model (System Boiler) :
Both for Central Heating (CH) and Domestic Hot Water (DHW) with external
storage tank (not included).
The assembly and usage information of
6/9 ST-CH and 12/15/18/24/27 MT-ST-CH ARCEUS electric
boilers are available in this manual. Detailed information have been provided in the guide regarding the
technical specification of the boiler, selection of the boiler location, fitting its water, electric supply
connections, maintenance information and solving of possible failures. Please carefully read the
manual in order to benefit from all the features of your boiler.
The Benchmark Checklist and Service Record Card are located at the back of the Operating Manual.
The Benchmark Checklist must be filled by
authorized engineer
during
installation. Operating Manual and Service Manual must be handed over the
user for future operations.
Service Record Card must be filled by
authorized engineer
and handed over the
user after each service operation and annual maintanence.
1.1
Installer’s Responsibility
The installer is responsible for the installation and initial start-up
of the boiler. Instructions are given below.
Check Operating and Service manuals and follow instructions before installation.
Carry out installation in compliance with the prevailing legislation and standarts.
Be sure that the system is flushed and inhibitor added.
Only
authorized engineer
must operate the boiler.
Explain the user about installation and operation of boiler.
Fill the Comissioning Checklist.
Give all Operating and Service manuals to user.
The warranty certificate must be registered by
authorized engineer
within 30 days after
installation.
4