Call
authorized engineer
to start up the boiler after all these processes
are completed. Commissioning must be strictly performed by authorized
service.
At the end of the commissioning of the boiler after installation, please
ask for information of
authorized engineer
on operating the boiler and
relevant safety devices on boiler.
10-USING THE BOILER
10.1 Switching Off the Boiler
You can switch off the boiler by holding down the ON/ OFF button for 3 seconds.
LCD light will be OFF after 1 minute.
Anti-freeze function remains active.
11-CONTROL PANEL
Figure
18
Control Panel View
K5
K6
K1
K3
K4
32