E 27
6.2
Screed heater gas connections
After the extension parts have been
mounted, the connection hoses for the
extension parts' burners must be con-
nected to the screed's pipe system.
-
All hoses must be checked for exter-
nal damage prior to use and, if any de-
fects are found, must be immediately
replaced with new hoses.
-
The connections can be easily estab-
lished by means of quick action cou-
plers (1).
f
Danger of fire and explosions!
Work on the heating system involves the
danger of fire and explosion.
Do not smoke! No naked flames!
-
After the extension parts have been removed, the hoses remain with the extension
part to which they are screwed.
614_Gas1.eps
1
Содержание V5100TV
Страница 2: ...www atlascopco com...
Страница 20: ...A 2...
Страница 30: ...B 10 5 Location of instruction labels and type plates 5 o 4 7 2 1 6 2 4 o 1 3...
Страница 34: ...B 14...
Страница 37: ...C 3 2 1 4 3...
Страница 38: ...C 4...
Страница 55: ...D 17 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 42 41 43 44...
Страница 57: ...D 19 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Страница 70: ...D 32 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Страница 86: ...D 48...
Страница 92: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Страница 117: ...E 31 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Страница 130: ...F 6 5 2 Guide tubes 1 1 2 2 2x 1 2...
Страница 134: ...F 10 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Страница 137: ...F 13 7 Gas system The gas system consists of the following main components Ignition burner 1 Spark plug 2 1 2...
Страница 150: ...F 26...
Страница 152: ...www atlascopco com...