E 3
E_EB3
4_VB340
__05.
08_G
B.
fm
-14 02-
05.
08
2.2
Mounting the side shields
The side shields are mounted after all
other mounting and adjustment work on
the screed has been completed.
- Insert swing lever shaft on side shield
through hole in extendable part or ex-
tension part.
- Use clip (1) to secure internal section
of swing lever shaft to prevent shaft
from sliding back out.
Also on outer face of side shield:
- Attach control arm of parallel guide to
pivot (2) and use folding pin (3) to se-
cure.
- Insert height adjustment crank in clip
(4) and use cotter pin (5) to secure.
Schildmon_340a.wmf
1
Schildmon_340b.wmf
4
5
3
2
Содержание Svedala Demag EB 34 Series
Страница 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Страница 14: ......
Страница 16: ......
Страница 70: ......
Страница 78: ...F 8 F_EB34_VB340_05 08_GB fm 8 18 6 2 Cleaning the screed Emptying the tamper compartment VB340 wmf 1 2 2 1...
Страница 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Страница 88: ......