D 9
D_E3
4_VB340_
05.
08_G
B.
fm
9-
26
- 01.
01.
07
3.4
Connection and leak test
The gas pipe system of the basic screed
and the extendable parts is permanently
installed. To connect the gas bottles:
- Unscrew the protective caps from the
bottle valves and screw onto the rear
of the bottle bracket.
- Check whether the quick action valves
are closed.
- Check that the bottle valves (30) are
properly closed.
Install the gas hoses with the pressure
reducers and the hose rupture protec-
tion devices (29) on the bottles.
A
Note:
The gas connections always have left-handed threads!
m
Make sure the gas pipe system has no leaks.
Gasflas.tif
29
30
Содержание Svedala Demag EB 34 Series
Страница 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Страница 14: ......
Страница 16: ......
Страница 70: ......
Страница 78: ...F 8 F_EB34_VB340_05 08_GB fm 8 18 6 2 Cleaning the screed Emptying the tamper compartment VB340 wmf 1 2 2 1...
Страница 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Страница 88: ......