Maintenance - 2000h
4812161201_F.pdf
2018-04-17
Maintenance - 2000h
Performed after 2000 operating hours (every two
years)
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Battery
- Check condition
Fig. Battery
The battery is sealed and maintenance-free.
Make sure there is no open flame in the vicinity
when checking the electrolyte level. Explosive gas
is formed when the alternator charges the battery.
Make sure there is no open flame in the vicinity
when checking the electrolyte level. Explosive gas
is formed when the alternator charges the battery.
When disconnecting the battery, always
disconnect the negative cable first. When
connecting the battery, always connect the
positive cable first.
When disconnecting the battery, always
disconnect the negative cable first. When
connecting the battery, always connect the
positive cable first.
The cable shoes should be clean and well-tightened.
Corroded cable shoes should be cleaned and greased
with acid-free Vaseline.
Wipe the top of the battery.
105
Содержание CC1300C
Страница 2: ......
Страница 10: ...e 4812161201_F pdf 2018 04 17...
Страница 14: ...Introduction 4812161201_F pdf 2018 04 17 4...
Страница 22: ...Special instructions 4812161201_F pdf 2018 04 17 12...
Страница 30: ...Technical specifications 4812161201_F pdf 2018 04 17 20...
Страница 34: ...Machine description 4812161201_F pdf 2018 04 17 24...
Страница 56: ...Operation 4812161201_F pdf 2018 04 17 46...
Страница 68: ...Operating instructions Summary 4812161201_F pdf 2018 04 17 58...
Страница 70: ...Preventive maintenance 4812161201_F pdf 2018 04 17 60...
Страница 79: ...Maintenance Maintenance schedule 4812161201_F pdf 2018 04 17 Service Checklist 69...
Страница 80: ...Maintenance Maintenance schedule 4812161201_F pdf 2018 04 17 70...
Страница 104: ...Maintenance measures 500 h 4812161201_F pdf 2018 04 17 94...
Страница 114: ...Maintenance 1000h 4812161201_F pdf 2018 04 17 104...
Страница 128: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...